My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ORANGE, COUNTY;ORANGE COUNTY FLOOD CONTROL DISTR.; IRVINE RANCH WATER DISTR., (2)
Clerk
>
Contracts / Agreements
>
O
>
ORANGE, COUNTY;ORANGE COUNTY FLOOD CONTROL DISTR.; IRVINE RANCH WATER DISTR., (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2017 1:08:41 PM
Creation date
5/8/2017 3:53:42 PM
Metadata
Fields
Template:
Contracts
Company Name
ORANGE, COUNTY;ORANGE COUNTY FLOOD CONTROL DISTR.; IRVINE RANCH WATER DISTR.,
Contract #
A-2016-180
Agency
Public Works
Council Approval Date
7/5/2016
Destruction Year
0
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5.9.3 COSTA MESA may utilize Reserve Funds to repair or replace the facilities or portions <br />thereof, damaged due to a catastrophic event (e.g. a severe storm, seismic activity, or fire) by <br />sending a written request with supporting documentation to the Director that specifies a use of <br />funds consistent with Reserve fund purposes. Upon completion of work paid with Reserve <br />Funds, COSTA MESA shall send OCFCD an accounting of expended funds and return any <br />unused funds for deposit back into the Reserve Account. - <br />5.9.4 After exhaustion of the Initial O&M Deposit COSTA MESA agrees to contribute to <br />long term O&M costs per its joint proportionate share as specified in Exhibit C2, <br />5.10 Records <br />COSTA MESA shall maintain a complete set of records and accounts of all O&M costs, <br />maintenance activities and schedules in accordance with generally accepted accounting <br />principles. Upon reasonable notice, COSTA MESA shall permit a Party or Parties' Project <br />Representatives to inspect and audit all work, materials, payroll, books, accounts, and other data <br />and records of COSTA MESA. Project Representatives shall also have the right to reproduce <br />any such books, records, and accounts. The above provisions with respect to audits shall extend <br />to and/or be included in contracts with COSTA MESA'S contractors. Costs incurred due to this <br />section are to be paid by the Party or Parties initiating any inspection or audit. <br />SECTION 6 <br />RESPONSIBILITIES OF IRWD <br />6.1 General Responsibilities <br />IRWD shall review the Project's plans and financially contribute toward the Project fund as <br />shown on Exhibit C 1. <br />6.2 Environmental Review,• Permitting <br />IRWD shall comply with all of the commitments and conditions set forth in the environmental <br />documentation, environmental permits, approvals, and applicable agreements obtained for the <br />Project as those commitments and conditions apply to its responsibilities under this Agreement. <br />6.3 Design <br />IRWD shall review all draft and final Project design reports, and PS&E submitted for its <br />approval. IRWD's Project Representative shall respond in writing to SANTA ANA as to a <br />submittal's review for approval in a timely manner. Subsequent to approval of the final design, <br />any material design change variance shall require mutual approval by the Project <br />Representatives. <br />6.4 Right„Way - Intentionally deleted <br />Santa Ana -Delhi Channel Diversion Project Agreement D15-013 Page 27 of 69 <br />
The URL can be used to link to this page
Your browser does not support the video tag.