My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ORANGE, COUNTY;ORANGE COUNTY FLOOD CONTROL DISTR.; IRVINE RANCH WATER DISTR., (2)
Clerk
>
Contracts / Agreements
>
O
>
ORANGE, COUNTY;ORANGE COUNTY FLOOD CONTROL DISTR.; IRVINE RANCH WATER DISTR., (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2017 1:08:41 PM
Creation date
5/8/2017 3:53:42 PM
Metadata
Fields
Template:
Contracts
Company Name
ORANGE, COUNTY;ORANGE COUNTY FLOOD CONTROL DISTR.; IRVINE RANCH WATER DISTR.,
Contract #
A-2016-180
Agency
Public Works
Council Approval Date
7/5/2016
Destruction Year
0
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6.5 Construction <br />IRWD shall waive any costs or fees with respect to the permits issued by IRWD in furtherance <br />of the Proj ect. The terms and conditions of the permits shall be consistent with this Agreement, <br />and in the case of a conflict, the terms and conditions of this Agreement shall control. <br />Prior to SANTA ANA's construction completion of the Diversion Structure and other Facilities, <br />IRWD shall have its Project Representative conduct a walk-through to promptly review the <br />improvements and provide any comments. Upon satisfaction of any and all the comments or <br />items, IRWD shall have its Project Representative provide written approval to SANTA ANA <br />that the Facilities have been constructed in accordance with the Approved Plans or are otherwise <br />acceptable. <br />6.6 Contribution <br />6.6.1 Within forty (40) days of the later of (i) execution of this Agreement or (ii) the expiration <br />of the applicable challenge periods for the Project environmental documentation or (iii) the <br />resolution of all court actions challenging such environmental documentation, IRWD shall make <br />a one-time lump sum payment of ONE HUNDRED AND NINETY-FIVE THOUSAND <br />DOLLARS ($195,000), as denoted per Exhibit Cl, into the Project Fund Account. <br />6.6.3 IRWD shall not be obligated to pay or contribute to O&M costs or required to contribute <br />to the Reserve Fund for the Facility. Provisions in this Agreement stating IRWD's non - <br />responsibility for particular costs or contributions shall not limit the generality of this Section. <br />6.7 Discharges During the Term <br />Term <br />6.7.1 IRWD shall have the right to continue to apply for permits consistent with the terms and <br />conditions of IRWD's existing CPP issued permits Nos. 2015-00435, 2015-00443, 2015-00444, <br />2015-00445, 2015-00461, 2015-00439, 2015-00440 and 2015-0044 1 allowing for their <br />discharge(s) into Santa Ana Gardens Channel (which further discharges to the Channel) from its <br />Well Nos. IRWD-1, IRWD-11, IRWD-C-8, and IRWD-C-9, and directly into the Channel from <br />its Well Nos. IRWD-2, IRWD-4, IRWD-5 and IRWD-6, or any replacements to these wells in <br />kind, with similar discharge release, quantities and timing. <br />6.7.2 COUNTY shall not unreasonably cancel or withhold renewal of any such discharge <br />permits to IRWD, which are in full compliance and effect on the Effective Date, on substantially <br />the same terms and conditions, provided IRWD abides by COUNTY's permit application and <br />renewal process with payment of applicable standard fees. <br />SECTION 7 <br />ORANGE COUNTY WATER DISTRICT <br />7.1 General Responsibilities <br />The Project proposes to divert dry -weather flows an Orange County Sanitation District <br />("OCSD") trunk line for conveyance to its sanitary sewer treatment plant and thereafter to the <br />Santa Ana -Delhi Channel Diversion Project Agreement D15-013 Page 28 of 69 <br />
The URL can be used to link to this page
Your browser does not support the video tag.