My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ORANGE, COUNTY;ORANGE COUNTY FLOOD CONTROL DISTR.; IRVINE RANCH WATER DISTR., (2)
Clerk
>
Contracts / Agreements
>
O
>
ORANGE, COUNTY;ORANGE COUNTY FLOOD CONTROL DISTR.; IRVINE RANCH WATER DISTR., (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2017 1:08:41 PM
Creation date
5/8/2017 3:53:42 PM
Metadata
Fields
Template:
Contracts
Company Name
ORANGE, COUNTY;ORANGE COUNTY FLOOD CONTROL DISTR.; IRVINE RANCH WATER DISTR.,
Contract #
A-2016-180
Agency
Public Works
Council Approval Date
7/5/2016
Destruction Year
0
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TCE - temporary construction easement. <br />Term - unless otherwise terminated or extended, this Agreement shall be effective for <br />an initial term of twenty-five years commencing on the Effective Date, and shall <br />automatically renew for ten year terms thereafter. <br />TMDL - Total Maximum Daily Loads, <br />Watershed Drainage Area - the impacted watershed area within Project limits shown <br />on Exhibit A. <br />RECITALS <br />A. The Parties are subject to regulations or requirements applicable to point source <br />discharges for bacteria, metals, nutrients, trash, selenium and other constituents; including but <br />not limited to, TMDL, applicable provisions of dewatering permits and time schedule orders the <br />Municipal Separate Storm Sewer System (" MS4 Permit, and/or other discharge permits, waste <br />discharge requirements, or discharge -related orders. fn a collaborative effort SANTA ANA, <br />NEWPORT BEACH, and COSTA MESA (collectively, "Cities") pursued satisfying current <br />and future NPDES requirements and proposed trash amendment to MS4 Permit requirements <br />(see Recital Q) through the development of a watershed regional diversion project. The Project <br />requires OCFCD and COUNTY cooperation in order for the Diversion Structure component to <br />be constructed, operated and maintained in and about the Channel; a portion of the land is under <br />the purview of JWA. <br />B. The Parties, other than OCWD and IRWD, caused the Diversion Structure Water <br />Capture and Reuse Structure Concept Feasibility Study dated July 8, 2013 to be conducted in <br />order to review the technical and economic feasibility of reducing pollutants inflows and trash <br />to the Channel ("Conceptual Report"). Based upon the Conceptual Report findings, possible <br />locations for the Diversion Structure system and the Project limits shown on Exhibits A-1 and <br />A-2 within the impacted watershed area (i.e., the Watershed Drainage Area) were proposed <br />and alternative Facility components were discussed. <br />C. The proposed Project is to be designed for the benefit of the Parties, who occupy <br />or operate within a region of approximately 11,120 acres, by diverting dry -weather flows and <br />trash from the Santa Ana -Delhi drainage system shown in Exhibit A. <br />D. It is contemplated that the Diversion Structure will be constructed upon land <br />owned by COUNTY, under the purview of JWA. Part of this County -land is leased to the "Golf <br />Lessee, and other parts are utilized for OCFCD's Channel and flood.control purposes in <br />accordance with the Flood Control Act. <br />E. OCFCD, COUNTY and JWA are amenable to accommodating the Diversion <br />Structure and appurtenant components upon their right-of-way in accordance with the terms <br />herein, provided that the Project: (1) will not violate the COUNTY's vesting deed restrictions or <br />Santa Ana -Delhi Channel Diversion Project Agreement D15-013 Page 8 of 69 <br />
The URL can be used to link to this page
Your browser does not support the video tag.