Laserfiche WebLink
MY OF Ai"i'TA ANA <br />'P,FF` NO,: 16-090 <br />WATER WELL, PLUMP A— ND N[O OR REPAIR SERVICES <br />e. Insulation.. Windings shall be doubie-dipped with Glass ld varnish end baked, Insulation shelf bo tested <br />phose-to-phase and phase -to -ground at 1..0C�Q volts do and y'eid a: Qn.e m.1 n,trte test rvsult.af 100 . rtrQg- <br />ohms or Wfar, <br />f, Firt Test; A 1CGOW-l't rneg-ortMOW shall be Used tb verify Ihsuf�Foh cori'tlrWlty, This readig shdfl <br />be docurnented..:After rea.sseMbly,. motor shall be test -run ak full voCtago and docurrrentationef current <br />ce. d g and vibratior readings shalf be prov.icfad to the end user_ {N0"l �u a 5k<V Meg --ohm meter shall <br />be Lased on all 4160V motors..) GOpper l)O resistance tests,. phase -to -phase, can rotor winding from slip <br />rings shall be performed, Ifi the rewound rotor falls to pass any test, the rotor shall be rejected, The <br />Contractorshali rebufld and retest «rail all tests are approved by the Clty. <br />8, PUMP P CONDlTICNING <br />a, D sassembie and clean.. <br />b. Replace ,seals and ball bearings per I7EASA Standards, Vendor shall use only manufacturer - <br />recommended ball bearings and mechanical seals_ <br />c, Change oil, <br />d. Ti st wlhd'fngs and rewind as necessary. <br />e. Reassemble and test.. <br />f. Dabum:ent and ph.0tograph, all conditions before and after drsasserrn.bly, seal and ball bearing <br />replaceirents arid final testing, <br />g. MACHINE WORK <br />MacKoe work shall apply to,. but not be limited to, the drill[ncd and tapping of broken bol:'ts, kh.erepairing of <br />dama ed' Iocktfrg. rfngs and ,stators, the repla.cing of power cords,. power cord assemblies, and power oprd <br />connectors and repairs'to in.ipelicrs, cav6rs; volutes, mnuntlhq roils, .bearing jaurneIs, and pump shafts, <br />ta, QUAf.'1'FrQ kAT]ON, <br />a. All electric motor repair shops shall 0e EASA. Aporedi.ted and shall pruvfdo.a copy oaf the certification <br />upon request.by.thq City, FaiIWO to prravIde a Saab-corntracto'r tlTat is an NASA Acura il- d Me�mbar <br />Ps a.pali of ffio proposal may be.grounds for proposal reject c.no <br />b.. Corikra.ctgr ar orltract sr's. saabccr?tracto:r shad. tea certified :os. an UL, r'ecifity-qn:d shall provide a..copy:af <br />the cartifred°tian rtpan re hest by the 'CKy. <br />c. Contractor small be rosponslble for obta'inin.g ail O,E,M. techrircal documer�.ts,. drawings and, parts when <br />necessary. . <br />Contractor shall have: all engineering, design, rnetailziag, welding, heat tresting, machining, baiancin.cg, <br />calibrating and testing capabilities necessary to completely refurbishlrewind electric motors. <br />e. Equipment used for inspecting, calibrating and testing pumps and motors shall be up-to-date and have <br />calibration certificates, less than one .year old., traceable to NiST -standards where applicable. <br />11, DOCUMENTATION <br />All work performed tc recondition.: repair and/or rewind motors shall be supplemented with reports. that <br />verify all processes to aceompllsh each job order. Documentation' shall Include, but is not limited to, the <br />following: <br />a. Fire -Disassembly Testing report for all activities as described. <br />b F'h.oto documentation of existing condition prior to fulfilling each described criteria of the disassembly <br />test, <br />o. Motor Disassembly report, including photo documentation before and after cleeaning. <br />