<br />e. Insulation.. Windings shall be doubie-dipped with Glass ld varnish end baked, Insulation shelf bo tested
<br />phose-to-phase and phase -to -ground at 1..0C�Q volts do and y'eid a: Qn.e m.1 n,trte test rvsult.af 100 . rtrQg-
<br />ohms or Wfar,
<br />f, Firt Test; A 1CGOW-l't rneg-ortMOW shall be Used tb verify Ihsuf�Foh cori'tlrWlty, This readig shdfl
<br />be docurnented..:After rea.sseMbly,. motor shall be test -run ak full voCtago and docurrrentationef current
<br />ce. d g and vibratior readings shalf be prov.icfad to the end user_ {N0"l �u a 5k<V Meg --ohm meter shall
<br />be Lased on all 4160V motors..) GOpper l)O resistance tests,. phase -to -phase, can rotor winding from slip
<br />rings shall be performed, Ifi the rewound rotor falls to pass any test, the rotor shall be rejected, The
<br />Contractorshali rebufld and retest «rail all tests are approved by the Clty.
<br />8, PUMP P CONDlTICNING
<br />a, D sassembie and clean..
<br />b. Replace ,seals and ball bearings per I7EASA Standards, Vendor shall use only manufacturer -
<br />recommended ball bearings and mechanical seals_
<br />c, Change oil,
<br />d. Ti st wlhd'fngs and rewind as necessary.
<br />e. Reassemble and test..
<br />f. Dabum:ent and ph.0tograph, all conditions before and after drsasserrn.bly, seal and ball bearing
<br />replaceirents arid final testing,
<br />g. MACHINE WORK
<br />MacKoe work shall apply to,. but not be limited to, the drill[ncd and tapping of broken bol:'ts, kh.erepairing of
<br />dama ed' Iocktfrg. rfngs and ,stators, the repla.cing of power cords,. power cord assemblies, and power oprd
<br />connectors and repairs'to in.ipelicrs, cav6rs; volutes, mnuntlhq roils, .bearing jaurneIs, and pump shafts,
<br />ta, QUAf.'1'FrQ kAT]ON,
<br />a. All electric motor repair shops shall 0e EASA. Aporedi.ted and shall pruvfdo.a copy oaf the certification
<br />upon request.by.thq City, FaiIWO to prravIde a Saab-corntracto'r tlTat is an NASA Acura il- d Me�mbar
<br />Ps a.pali of ffio proposal may be.grounds for proposal reject c.no
<br />b.. Corikra.ctgr ar orltract sr's. saabccr?tracto:r shad. tea certified :os. an UL, r'ecifity-qn:d shall provide a..copy:af
<br />the cartifred°tian rtpan re hest by the 'CKy.
<br />c. Contractor small be rosponslble for obta'inin.g ail O,E,M. techrircal documer�.ts,. drawings and, parts when
<br />necessary. .
<br />Contractor shall have: all engineering, design, rnetailziag, welding, heat tresting, machining, baiancin.cg,
<br />calibrating and testing capabilities necessary to completely refurbishlrewind electric motors.
<br />e. Equipment used for inspecting, calibrating and testing pumps and motors shall be up-to-date and have
<br />calibration certificates, less than one .year old., traceable to NiST -standards where applicable.
<br />11, DOCUMENTATION
<br />All work performed tc recondition.: repair and/or rewind motors shall be supplemented with reports. that
<br />verify all processes to aceompllsh each job order. Documentation' shall Include, but is not limited to, the
<br />following:
<br />a. Fire -Disassembly Testing report for all activities as described.
<br />b F'h.oto documentation of existing condition prior to fulfilling each described criteria of the disassembly
<br />test,
<br />o. Motor Disassembly report, including photo documentation before and after cleeaning.