My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL PUMP COMPANY, INC-2016
Clerk
>
Contracts / Agreements
>
G
>
GENERAL PUMP COMPANY, INC-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2021 10:09:53 AM
Creation date
5/8/2017 3:54:59 PM
Metadata
Fields
Template:
Contracts
Company Name
GENERAL PUMP COMPANY, INC
Contract #
A-2016-313
Agency
Public Works
Council Approval Date
11/15/2016
Insurance Exp Date
2/5/2022
Destruction Year
0
Document Relationships
GENERAL PUMP COMPANY, INC
(Amended By)
Path:
\Contracts / Agreements\G
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WATER WELL,. PUMP AND MOTOR REPAIR SERVICES <br />d, Motor Inspeotlon report, in.efuding stator core lass tosl'ng results, Photo documerta.tion of coils,. <br />windings and conductom showing any s€gns of excessive wear or failure, <br />e. mechanreal fit.nleasurerndnts shsli be' recorded as specified. Photo documentaflon shall bs submitted <br />for all replaced bearings, grease �€ttirigs, plugs, etc, <br />f, Rotor ( aVidng report as sp6bifiOd. <br />g� Insulation report: as specified above pefore and after photo docurroni;alibn of the wl:nd'rn.gs prior to <br />varnish[ngl and baking. <br />h. Final test report as specified, <br />i, Pamp Recond'itidning report as specified. <br />Ali testing, €nspec:tions and incidentals related to required reports shall be considered included with€n the <br />bid items for said testing report and no adcdltional compensation shall be allowed, <br />Cr. Security Requiromerts <br />Public Works Agency field. representative will unlock the Publics Works Agency fadliflas entry dates <br />on the first. day of work to allow Contractor access. Contractor shail then supply their own <br />padlock(s)for entry gates to all Public Vl/arks Agem,y facilities. toniracitor`s padlocks) shall lbck <br />onto the. Pub(/ c Works Agency's padlack connecting to tha chafnAnk„ which an:ables both. the .public. <br />Works Agency field reprosentadve and Contractor to unlock the entry gates. after complation of <br />work, pa.dlock(s)' shall be removed .icy the Contractor. <br />Contraafbr a.n&or suboon tracto:rs shaft notify the Public. WwX8 Agency field repres6ht'ative cipon <br />arrival and departure to or from jobslte. <br />D.. Parts, Matdrials and Warranties <br />Tha Public Works Agency Mill relrnburss the Contractor for the cost of repair pdits, materials, and <br />repla:cerneni equ'ipmentr. plus I'S percent mierkup, providecrthe Corrt'ranfpr has obtafned't "O C4V"'s pd6r <br />written apprnvai of an:Cr ctor's. �urAori estrmat . All rs:plase.m :nt equ.ip ,ner�.k.;shail ,k�e approved .b:ythe <br />Public Work§ Agency prior tv the purchasing of the aquipmerf- The. Contractor shall provide <br />mgn.ufacWrer dooumentation to thra Public Works Agency For any rep€acemeat eq;u.iprnert, The <br />CO.6tra.ctor.sJhall submit an invoice'with. attached: dppllcable recelptls for a particular job to th:o. Project <br />Manager, <br />The Contractor shall assure that all material's., parts, and workmanship supplied shall be free from. ar€cginal <br />or developed db('eats. Contractor shalt provide a mihimum of one year warranty fog ma.terl'afs parts and <br />woekManship. Should original or devoloped detects and/or failures appear within the- minimum warranty <br />of ore year after work completion, Contractor shall, at its expense, rectify s�ich defects andlorfaiiures and <br />make all roplacernents and adjustments that Wereq.uired. <br />Corrective work shall be perform -ad by the Contractor and given the highest priority after Public <br />Works Agency's notification to do so, and small be completed to the satisfaction of the Project Manager, <br />The Contractor shall proceed diligently to complete said worm within the time allotted as approved by the <br />Project Manager. <br />E. As -Needed Repairs <br />At the direction of Project Manager„ the Contractor stall prov€do a wrltten estirnate in.cluding labcir and <br />parts, materials and equ€pmert needed to perform the As -Needed Ropai:rs, Upon written approval from <br />the Project Manager, the Contractor shall perform the As -Needed Repairs. The cost for parts and <br />materials WHI ba paid in accordance with the Section 0 above. <br />
The URL can be used to link to this page
Your browser does not support the video tag.