My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
DAVID VOLZ DESIGN-2017
Clerk
>
Contracts / Agreements
>
D
>
DAVID VOLZ DESIGN-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2024 10:41:13 AM
Creation date
5/18/2017 11:55:49 AM
Metadata
Fields
Template:
Contracts
Company Name
DAVID VOLZ DESIGN
Contract #
A-2017-062
Agency
PUBLIC WORKS
Council Approval Date
4/4/2017
Expiration Date
4/4/2019
Insurance Exp Date
3/14/2019
Destruction Year
2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />SCOPE OF SERVICES <br />David Volz Design will provide construction documents for public <br />bidding of Santiago Park Gas House Area development plans. <br />The basis of the design will be the city supplied program and the <br />concept plan to be developed in Task 1 below. <br />Task 1 - Pre -Design <br />Initial project services will include a site analysis, review of the <br />preliminary plan and review of background documents. A kick-off <br />meeting with the city project staff will be held to review initial find- <br />ings, discuss the project scope, goals and objectives, potential <br />elements and issues and schedule. The DVD team will facilitate <br />and lead three (3) concept planning meetings with the Park San- <br />tiago Neighborhood Association (PSNA) to obtain input and to <br />finalize a concept plan for this area. <br />Meetings - Project Kick-off Meeting with city staff <br />Three (3) Concept Planning Meetings with PSNA <br />Presentation and review for approval by the <br />PRCSA <br />Deliverables - Synopsis of initial reviews and project schedule <br />Up to three (3) rendered concept plans for <br />community review <br />Final Concept Plan for the area development <br />Task 2 - Design Development (50% plans) <br />The park design will be developed based upon the approved con- <br />ceptual design. The DVD team will undertake initial engineering, <br />landscape architectural, and electrical engineering. <br />Meetings - City Project Team Review Meeting <br />Deliverables - 50% construction documents, draft technical <br />specifications, opinion of probable cost, lighting <br />layouts, photometrics, materials submittal. Also, <br />site survey and utilities information will be <br />submitted for city review. <br />Task 3A - Construction Documents (90% plans) <br />Construction documents will be updated based upon city guid- <br />ance after review of Design Development documents. The up- <br />dated plans will provide detailed engineering, landscape, irriga- <br />tion and construction layout plans. Plans shall include: <br />Tusfln Branch Trails. <br />City of Tustin <br />Los Rios Park. City of San Juan Capistrano <br />Pioneer Road Park. <br />City of Tustin <br />Hu deas Barton Amphitheater. City of Yorha Linda <br />Stanton Central Park. City of Stanton <br />11111aY1111® <br />........................................................................................................................................................-...�- <br />Designing landscape that create community... <br />
The URL can be used to link to this page
Your browser does not support the video tag.