My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
DAVID VOLZ DESIGN-2017
Clerk
>
Contracts / Agreements
>
D
>
DAVID VOLZ DESIGN-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2024 10:41:13 AM
Creation date
5/18/2017 11:55:49 AM
Metadata
Fields
Template:
Contracts
Company Name
DAVID VOLZ DESIGN
Contract #
A-2017-062
Agency
PUBLIC WORKS
Council Approval Date
4/4/2017
Expiration Date
4/4/2019
Insurance Exp Date
3/14/2019
Destruction Year
2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCOPE OF SERVICES <br />Los Rios Park, City of Ban Juan Capistrano <br />Heniage Island Park, City of Cerritos Tustin Branch Trails. City of Tustin <br />Admiral Kidd Park City of Long Beach <br />Title Sheet <br />Civil Engineering <br />• Site Erosion Plan <br />• Parking lot at Valencia Avenue <br />• Horizontal and Vertical Control Plan <br />• Grading and on -site Drainage Plan <br />• Site Utility Plan <br />Architectural (Gas House and Restroom) <br />• Plans Elevations, Electrical, Plumbing details <br />Structural Engineering Details (Gas House and Restroom) <br />• Plans, details <br />• Structural calculations <br />Landscape Architecture <br />• Site Layout / Construction Plans and Details <br />(including plumbing) <br />• Site Sections, as applicable <br />• Planting Plans/Details/Notes <br />• Irrigation Plans/Details/Calculations/Notes <br />Electrical <br />• Electrical Site Plan to include lighting and electrical outlets <br />• Photometrics <br />• Location of panels, switchgear, meters <br />• Schedules <br />• Details <br />• Notes, specifications <br />Meetings - City Project Team Review Meeting <br />Deliverables - Construction Document submittal (90% and <br />100%) for plan review by Park, Recreation and <br />Community Services Agency, Planning and <br />Building Agency and Public Works Agency. This <br />Construction Plan set will include technical <br />specifications and an updated opinion of probable <br />costs. <br />Task 3B - Final Construction Documents (100%) <br />Construction plans, specifications, and estimate will be updated <br />based upon city reviews. The final design package will be read- <br />ied for bidding and construction <br />Meetings - Final Review Meeting with city project staff <br />Deliverables - Turnover of files for city records and bidding. <br />........................................................................................................................................................ <br />OVID <br />Designing landscape that create community... <br />
The URL can be used to link to this page
Your browser does not support the video tag.