My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
DAVID VOLZ DESIGN-2017
Clerk
>
Contracts / Agreements
>
D
>
DAVID VOLZ DESIGN-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2024 10:41:13 AM
Creation date
5/18/2017 11:55:49 AM
Metadata
Fields
Template:
Contracts
Company Name
DAVID VOLZ DESIGN
Contract #
A-2017-062
Agency
PUBLIC WORKS
Council Approval Date
4/4/2017
Expiration Date
4/4/2019
Insurance Exp Date
3/14/2019
Destruction Year
2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT B <br />FEE SCHEDULE <br />David Volz Design proposes the following Not to Exceed fee schedule to provide the services identified in this <br />proposal. The tasks listed below are offered at a fixed fee for the design services for identified program elements. <br />The services included in this spread sheet are project management, park design, landscape architecture, and <br />listed support services. <br />TASK 1 - PRE DESIGN <br />A. Landscape Architect - Project Management, Pre <br />Design <br />B. Civil Engineering <br />C. Architectural / Structural Engineering <br />D. Electrical Engineering <br />TASK 2 - DESIGN DEVELOPMENT (50% PLANS) <br />A. Landscape Architect - Project Management, <br />Design Development <br />B. Civil Engineering <br />C. Architectural / Structural Engineering <br />D. Electrical Engineering <br />PR <br />LA <br />PP <br />CT <br />AD <br />Total <br />$220 <br />$193 <br />$135 <br />$121 <br />$115 <br />Hrs <br />Fee <br />8 <br />8 <br />8 <br />12 <br />2 <br />[38 <br />J$ 6,066 <br />c'I7�I m i)■mull <br />TASK 3A - CONSTRUCTION DOCUMENTS (90% PLANS) <br />A. Landscape Architect - Project Management, <br />Construction Documents 32 1 44 1 42 <br />B. Civil Engineering <br />C. Architectural / Structural Engineering <br />D. Electrical Engineering <br />44 <br />$ 5,290 <br />$ 2,523 <br />$ 631 <br />$ 14,510 <br />12 1162 I $ 25,940 <br />$ 17,825 <br />$ 8,503 <br />$ 2,126 <br />$ 54,393 <br />12 1174 I $ 27,906 <br />$ 31,223 <br />$ 14,893 <br />$ 3,723 <br />TASK 313 - FINAL CONSTRUCTION DOCUMENTS <br />A. Landscape Architect - Project Management, Final 2 I 8 6 8 2 <br />Construction Documents <br />B. Civil Engineering <br />C. Architectural / Structural Engineering <br />D. Electrical Engineering <br />Proposal to Provide Landscape Architectural Services for <br />Santiago Park Gas House, City of Santa Ana <br />$ <br />77,745 <br />26 I $ <br />3,992 <br />$ <br />10,408 <br />$ <br />4,964 <br />$ <br />1,241 <br />$ 20,605 <br />2/21/2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.