My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
DAVID VOLZ DESIGN-2017
Clerk
>
Contracts / Agreements
>
D
>
DAVID VOLZ DESIGN-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2024 10:41:13 AM
Creation date
5/18/2017 11:55:49 AM
Metadata
Fields
Template:
Contracts
Company Name
DAVID VOLZ DESIGN
Contract #
A-2017-062
Agency
PUBLIC WORKS
Council Approval Date
4/4/2017
Expiration Date
4/4/2019
Insurance Exp Date
3/14/2019
Destruction Year
2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FEE SCHEDULE <br />TASK 4 - BID ADVERTISEMENT, CONSTRUCTION ADMINSTRATION, RECORD DRAWINGS <br />A. Landscape Architect - Project Management, Bid <br />Advertisement, Construction Administration, 6 6 6 16 4 38 J$ 5,684 <br />Record Drawings <br />B. Civil Engineering $ 2,760 <br />C. Architectural / Structural Engineering $ 1,317 <br />D. Electrical Engineering $ 329 <br />$ 10,090 <br />OPTIONAL: <br />Site Survey $ 9,545 <br />Geotechnical (LGC Geotechnical) $ 16,675 <br />REIMBURSABLES <br />Reimbursable expenses, printing, copying, postage, etc. <br />where identified included in proposed fee. <br />Estimate $ 1,000 <br />TOTAL PROPOSED DESIGN FEE $ 204,563 <br />ASSUMPTIONS: <br />1. Subconsultant services, civil engineering and electrical engineering, listed above include administrative mark- <br />up of 15%. <br />2. Boundary and property line research if needed will required an additional fee. <br />Proposal to Provide Landscape Architectural Services for <br />Santiago Park Gas House, City of Santa Ana <br />2/21/2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.