My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-025 - Uniform Schedule of Miscellaneous Fees for Fiscal Year 2017-2018
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2017
>
2017-025 - Uniform Schedule of Miscellaneous Fees for Fiscal Year 2017-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2017 4:52:20 PM
Creation date
6/8/2017 10:07:58 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2017-025
Date
6/6/2017
Destruction Year
p
Document Relationships
2016-036 - Uniform Schedule of Miscellaneous Fees For Fiscal Year 2016-2017
(Repeals)
Path:
\Resolutions\CITY COUNCIL\2011 -\2016
2018-040 - Uniform Schedule of Miscellaneous Fees for Fiscal Year 2018-2019
(Related to)
Path:
\Resolutions\CITY COUNCIL\2011 -\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESOLUTION 2017-025 <br />REVENUE <br />FY 17-18 <br />ACCOUNT <br />DEPARTMENT/MISCELLANEOUS FEE OR SERVICE <br />UNIT <br />FEES <br />SECTION IX <br />PLANNING & BUILDING AGENCY <br />51603 <br />8) <br />Service Meters, Reset Meters, Subpanel, Switchboard, Motor <br />Control Center, or similar equipment changes or additions. <br />599 volts or less, under 400 amps. <br />Each Meter <br />37.21 <br />599 volts or less, 400 amps and less than 1200 amps. <br />Each Meter <br />93.17 <br />598 volts or less, 1200 amps and over. <br />Each Meter <br />187.37 <br />51603 <br />9) <br />Signs and high-potential gas tube lighting, each <br />Each <br />37.21 <br />Note: This shall include all necessary control equipment <br />51603 <br />10) <br />Swimming pool, fountain, spas, each <br />Each <br />82.28 <br />51603 <br />11) <br />Above ground spas <br />Each <br />26.49 <br />51603 <br />12) <br />Temporary power- construction: <br />For services supplying a temporary power pole, <br />Each <br />64.69 <br />pedestal or piggyback <br />For a system of distribution and utilization of poles <br />Each Pole <br />12.29 <br />for temporary construction power, each pole <br />51603 <br />13) <br />Temporary construction lighting: <br />500 lamps or less <br />5.54 <br />Over 500 lamps <br />9.66 <br />51603 <br />14) <br />Temporary services: <br />At the time of application for temporary power, the owner <br />shall post a $1,000.00 cash or cashier's check conforming to the <br />Santa Ana Municipal Code Section 8-1768 for each service <br />meter. This deposit shall be released upon request after the <br />Certificate of Completion or Certificate of Occupancy is issued. <br />Temporary Electrical Service, Prior to Approval <br />Each Meter <br />234.98 <br />Or Occupancy (30 Days) <br />Temporary work with service, each meter <br />Each Meter <br />32.72 <br />51603 <br />15) <br />Lighting standards: <br />With one (1) fixture each <br />Each <br />12.29 <br />Each additional fixture on the same standard <br />Each <br />3.55 <br />55 <br />
The URL can be used to link to this page
Your browser does not support the video tag.