Laserfiche WebLink
RESOLUTION 2017-025 <br />REVENUE <br />FY 17-18 <br />ACCOUNT <br />DEPARTMENT/MISCELLANEOUS FEE OR SERVICE <br />UNIT <br />FEES <br />SECTION IX <br />PLANNING & BUILDING AGENCY <br />51603 <br />16) Time clock or photo electric cell, each <br />Each <br />9.66 <br />51603 <br />17) Radiant ceiling heat per room <br />Per Room <br />12.29 <br />51603 <br />18) Power apparatus: generators, motors, transformers, <br />rectifiers, synchronous converters, capacitors, <br />industrial heating, cooking or baking equipment, and <br />other apparatus as follows: <br />(Ratings -horsepower (H P), kilowatts (KW), and <br />Kilovolt amps (KVA)) <br />Up to and including 1 HP, KW, KVA each <br />Each <br />5.01 <br />Over 1 and not over 10 HP, KW, KVA each <br />Each <br />12.93 <br />Over 10 and not over 50 HP, KW, KVA each <br />Each <br />26.20 <br />Over 50 and not over 100 HP, KW, KVA each <br />Each <br />56.13 <br />Over 100 and not over 500 HP, KW, KVA each <br />Each <br />74.77 <br />Over 500 HP, KW, KVA each <br />Each <br />93.17 <br />51603 <br />19) Demolition, per project <br />Per Project <br />36.28 <br />51603 <br />20) Inspections outside of normal business hours (four hour <br />Per Hour <br />93.17 <br />minimum charge for Holidays, Saturday or Sunday <br />inspections) <br />51603 <br />21) Re -inspection fee assessed under applicable provisions <br />Per Hour <br />93.17 <br />of the Building Code <br />51603 <br />22) Inspections for which no fee is specifically <br />Per Hour <br />93.17 <br />indicated (minimum charge - one (1) hour) <br />53601 <br />23) Additional plan review required by changes, additions, or <br />Per Hour <br />93.17 <br />revisions to approved plans (minimum charge - one (1) hour) <br />ELECTRICAL PLAN CHECK FEES <br />Whenever electrical plans are required by the Building <br />Official, plan check fees shall be 65% of the electrical <br />permit fee and shall be paid at the time of submitting plans. <br />56 <br />