My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-025 - Uniform Schedule of Miscellaneous Fees for Fiscal Year 2017-2018
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2017
>
2017-025 - Uniform Schedule of Miscellaneous Fees for Fiscal Year 2017-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2017 4:52:20 PM
Creation date
6/8/2017 10:07:58 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2017-025
Date
6/6/2017
Destruction Year
p
Document Relationships
2016-036 - Uniform Schedule of Miscellaneous Fees For Fiscal Year 2016-2017
(Repeals)
Path:
\Resolutions\CITY COUNCIL\2011 -\2016
2018-040 - Uniform Schedule of Miscellaneous Fees for Fiscal Year 2018-2019
(Related to)
Path:
\Resolutions\CITY COUNCIL\2011 -\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESOLUTION 2017-025 <br />REVENUE <br />FY 17-18 <br />ACCOUNT <br />DEPARTMENT/MISCELLANEOUS FEE OR SERVICE <br />UNIT <br />FEES <br />SECTION IX <br />PLANNING & BUILDING AGENCY <br />51603 <br />16) Time clock or photo electric cell, each <br />Each <br />9.66 <br />51603 <br />17) Radiant ceiling heat per room <br />Per Room <br />12.29 <br />51603 <br />18) Power apparatus: generators, motors, transformers, <br />rectifiers, synchronous converters, capacitors, <br />industrial heating, cooking or baking equipment, and <br />other apparatus as follows: <br />(Ratings -horsepower (H P), kilowatts (KW), and <br />Kilovolt amps (KVA)) <br />Up to and including 1 HP, KW, KVA each <br />Each <br />5.01 <br />Over 1 and not over 10 HP, KW, KVA each <br />Each <br />12.93 <br />Over 10 and not over 50 HP, KW, KVA each <br />Each <br />26.20 <br />Over 50 and not over 100 HP, KW, KVA each <br />Each <br />56.13 <br />Over 100 and not over 500 HP, KW, KVA each <br />Each <br />74.77 <br />Over 500 HP, KW, KVA each <br />Each <br />93.17 <br />51603 <br />19) Demolition, per project <br />Per Project <br />36.28 <br />51603 <br />20) Inspections outside of normal business hours (four hour <br />Per Hour <br />93.17 <br />minimum charge for Holidays, Saturday or Sunday <br />inspections) <br />51603 <br />21) Re -inspection fee assessed under applicable provisions <br />Per Hour <br />93.17 <br />of the Building Code <br />51603 <br />22) Inspections for which no fee is specifically <br />Per Hour <br />93.17 <br />indicated (minimum charge - one (1) hour) <br />53601 <br />23) Additional plan review required by changes, additions, or <br />Per Hour <br />93.17 <br />revisions to approved plans (minimum charge - one (1) hour) <br />ELECTRICAL PLAN CHECK FEES <br />Whenever electrical plans are required by the Building <br />Official, plan check fees shall be 65% of the electrical <br />permit fee and shall be paid at the time of submitting plans. <br />56 <br />
The URL can be used to link to this page
Your browser does not support the video tag.