My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25I - AGMT FOR REHABILIATION OF WELL NO. 32
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2017
>
06/20/2017
>
25I - AGMT FOR REHABILIATION OF WELL NO. 32
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2017 8:47:14 AM
Creation date
6/15/2017 4:27:04 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25I
Date
6/20/2017
Destruction Year
2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
We have broken down our approach into three <br />parts, Well 32/Morrison Park, the conveyance <br />pipeline and the John Garthe Reservoir site. Each <br />element has challenges that the project team will <br />need to evaluate and work through with the City, <br />Summarized below are the key critical elements <br />that the project team has identified for each site: <br />1. Incorporating an aboveground well facility <br />that is functional and easy to maintain while <br />maintaining the use and functionality of Morrison <br />Public Park, <br />2. Incorporating the recently constructed low <br />impact design (LID) in and around the park's <br />parking lot and incorporating the LID design <br />into the new improvements and carrying the <br />landscaping theme throughout the new well site. <br />3. Identifying the construction impacts to the park <br />and surrounding residential area and develop <br />criteria that mitigates/minimizes these impacts to <br />the park use and the residents. <br />Well #32 Rehabilitation Engineering Services <br />2. Santiago Creek crossing whether the bridge can <br />be utilized or the pipeline needs to be bored and <br />jacked below the creek crossing. <br />3. Traffic control on Bristol Street and Memory <br />Lane. Bristol Street is a heavily congested utility <br />corridor and a major thoroughfare for traffic. <br />1, Modification of control system to incorporate <br />Well #32 and the dedicated communication fiber <br />optic conduit. <br />Conveyance Pipeline <br />2, Connection of the new Well #32 pipeline to <br />1. Pipe size based on either using a pressure <br />the existing reservoir fill line and locating the <br />sustaining valve at John Garthe Reservoir <br />pressure sustaining valve, if required, <br />or frictional losses in the pipe to provide <br />3, fiber optic conduit routing through the site and <br />backpressure and keep the well on its pumping <br />into the existing control room. <br />curve. <br />Well #32/Morrison Park Before and After Example <br />251-13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.