City of Santa Ana <br />Develop control panel drawings for the Well #32 <br />Station and John Garthe Pump Station. Well #32 <br />will require a new Motor Control Center Lineup <br />with a main RTU site control panel, while Garthe <br />Pump Station will require a new main RTU Control <br />Panel to accommodate the introduction of a new <br />fill well. Each panel drawing shall fully specify <br />all system equipment in the panel, including but <br />not limited to, PLCs, HMI's, Radios, input/output <br />cards, timers, fuses, switches, panel dimensions, <br />backup power supplies and relays. Panel drawings <br />shall be detailed and precise for construction and <br />fabrication purposes. Panel design submittals shall <br />correspond with the 60%, 100% and final design <br />set time frames, <br />Drawings shall include, but not be <br />limited to: <br />1. All wiring diagrams for each panel including <br />analog inputs, analog outputs, discrete inputs, <br />discrete outputs, terminal blocks, etc. This <br />design shall be provided to the Contractor for <br />fabrication. <br />2. The loop diagrams shall include content <br />required by ANSI/ISA S5.4 - Instrument Loop <br />Diagrams. <br />3. Each control panel drawing shall also have <br />Factory Acceptance Test (FAT) requirements <br />and Site Acceptance Test (SAT) requirements. <br />Acceptance testing requirements will be <br />developed based on all operational and audit <br />workshops conducted and be individually <br />created based on the applied site. Clear <br />definitions of acceptance criteria will be <br />required. <br />4, In the event of a failed FAT or SAT, procedures <br />for correction and retesting shall be defined. <br />5, Drawings shall include all standard field <br />wire labeling requirements, wire termination, <br />color coding of wiring and devices as well as <br />nameplates. <br />Develop standardized functional specifications <br />for the site. These specifications shall be used <br />by the Contractor to program all logic controllers, <br />Testing requirements of the programmable logic <br />controllers shall be included in the FAT and/ <br />or SAT requirements defined above. These site <br />standardized specifications shall also be intended <br />for use as the Operational Site Manual for the Well <br />#32 and John Garthe Pump Station Operators. <br />These specifications shall include, but not be <br />limited to, the following: <br />1. Narrative overview of the function and <br />operation of Well #32 and John Garthe Pump <br />Station. <br />2. Identification of all components of the station <br />(i.e., equipment, instrumentation, etc). <br />3. Narrative description of the functionality of each <br />component of the station (e.g., pumps, tanks, <br />VFDs, valves, meters, sensors/transmitters, <br />monitors, etc.), <br />4. Description of the process control strategies for <br />the station, as follows: <br />A. Narrative description of each process <br />control strategy; <br />S. Identification of the specific 1/0, set <br />points, commands, and communications <br />associated with each strategy; <br />C. Detailed description of the control logic <br />for each component/strategy, including <br />parmissives, interlocks, PID controls, etc.; <br />5. Description of the SCADA interfaces (The City <br />SCADA Network is Dynac ES provided by <br />Kapsch TrafficCom USA, Inc); <br />6, Narrative and detailed description of system <br />alarms and other functionality. <br />[lased upon Tetra Tech's detailed understanding <br />of John Garthe Pump Station and Well #32 <br />functionality and operations, we will develop <br />comprehensive Factory Acceptance Test (FAT) <br />Criteria and Site Acceptance Test (SAT) criteria, <br />providing recommendations for test protocols, <br />251-26 <br />