My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25K - AGMT SPILL RESPONSE AND STORM DRAIN FACILITY CLEANING
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2017
>
06/20/2017
>
25K - AGMT SPILL RESPONSE AND STORM DRAIN FACILITY CLEANING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2017 8:48:38 AM
Creation date
6/15/2017 4:27:20 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25K
Date
6/20/2017
Destruction Year
2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a. Deploy containment at various points along the projected travel path of the discharge and protect near- <br />by storm drain facilities from contamination. The City shall provide a description of the site and <br />discharge to the best of their ability during the initial request. The contractor shall respond within 1 hour <br />of initial request, <br />b. Deploy all necessary personnel, equipment and materials to recover the discharge. <br />c. Conduct confined space entry and video camera inspection of storm drain facilities. <br />d. Perform steam/pressure washing of the containhnated area, including storm drain facilities to the <br />satisfaction of the City. <br />e. Take discharge water samples for lab analysis and provide results to the City. <br />£ Provide routine pick-ups of hazardous waste throughout the City and at the City Yard. <br />g. Manifest the waste lawfiilly and efficiently to the satisfaction of the California Department of Toxic <br />Substances Control (DTSC), the United States Department of Transportation, The Environmental <br />Protection Agency and the EPA -permitted disposal, facilities receiving the waste, <br />h. Provide temporary storage, transport and proper legal disposal of recovered discharge. <br />i, Provide an incident report with before and after pictures within I week of performing the work required <br />by this Contact and an annual report of all incidents within 2 weeks after the end of the City's fiscal <br />year. The City shall provide sample formats for each report, <br />j. Upon request, the Contractor shall submit supplemental proposals for Additional Work not called for <br />under the Scope of Work of this Contract. The Contractor must obtain written approval prior to <br />commencing any Additional Work. <br />k, Adhere to all the requirements of the City's NPDES Permit while performing the work required for this <br />contract, <br />B. Storm Drain Facility Clearting and Maintenance <br />Firm shall be capable of performing the following tasks; <br />a. Perform thorough inspection of all Catch Basins throughout the City and provide run inspection schedule <br />within 7 days of Notice to Proceed, <br />Remove the existing manhole cover and reinstall and fasten (lie manhole cover whenever unattended. <br />The replacement of missing or damaged screws or bolts shall be, at no additional cast and should be <br />noted on the Inspection Report, <br />During Storm Season, Perform thorough inspection of all Catch Basin with Inserts throughout the City <br />within 7 days of each Storm Season inonth. <br />b. During each inspection, remove all trash and debris found in front of curb opening or on ARS Insert and <br />all vegetation growing across and/or blocking the opening, <br />City of Santa Ana RFP 16-144 <br />Page At -2 <br />25K-38 <br />
The URL can be used to link to this page
Your browser does not support the video tag.