My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23A - CONTRACT CONSTRUCTION OF BRISTOL ST IMPROV, WATER MAIN AND SEWER MAIN IMPROV
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2017
>
06/20/2017
>
23A - CONTRACT CONSTRUCTION OF BRISTOL ST IMPROV, WATER MAIN AND SEWER MAIN IMPROV
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2017 8:43:00 AM
Creation date
6/15/2017 4:28:22 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23A
Date
6/20/2017
Destruction Year
2022
Document Relationships
LOS ANGELES ENGINEERING, INC.,
(Message)
Path:
\Contracts / Agreements\ PROJECTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REQUEST FOR <br />COUNCIL ACTION <br />CITY COUNCIL MEETING DATE: <br />JUNE 20, 2017 <br />TITLE: <br />AWARD CONTRACT TO LOS ANGELES <br />ENGINEERING, INC., FOR CONSTRUCTION <br />OF BRISTOL STREET IMPROVEMENTS, <br />WATER MAIN AND SEWER MAIN <br />IMPROVEMENTS FROM WASHINGTON TO <br />SEVENTEENTH (PROJECT NOS. 11-6740, <br />17-6472, & 17-6473) <br />(STRATEGIC PLAN NOS. 6, 113; 1C; 1G) <br />CITY M A ER <br />RECOMMENDED ACTION <br />CLERK OF COUNCIL USE ONLY: <br />APPROVED <br />❑ As Recommended <br />❑ As Amended <br />❑ Ordinance on 1b' Reading <br />❑ Ordinance on 2 n Reading <br />❑ Implementing Resolution <br />❑ Set Public Hearing For <br />CONTINUED TO <br />FILE NUMBER <br />1. Award a contract and authorize the City Manager and the Clerk of the Council to execute a <br />construction contract with Los Angeles Engineering, Inc., the lowest responsible bidder, in <br />accordance with the base bid in the amount of $4,871,476, for the term beginning upon <br />execution of the contract and ending upon project completion, for construction of the Bristol <br />Street Improvements, Water Main, and Sewer Main Improvements projects; subject to <br />nonsubstantive changes approved by the City Manager and the City Attorney. <br />2. Approve the Project Cost Analysis for a total estimated construction delivery cost of <br />$6,135,644, which includes the contract bid amount, administration, inspection and testing, <br />and an authorized contingency of $777,190. <br />DISCUSSION <br />Bristol Street is a regionally significant north -south corridor which is designated as a major arterial <br />highway in the City's General Plan Circulation Element. Bristol Street between Warner Avenue <br />and Memory Lane is a long-term improvement project to be completed in several phases as <br />funding becomes available. Two phases have already been completed, and three more phases, <br />including this one, will be constructed to complete the improvements. This phase will improve <br />Bristol Street from Washington Avenue to Seventeenth Street, as shown in Exhibit 1. <br />The improvements include roadway widening from two to three lanes in each direction with <br />protected bike lanes, wider sidewalks, parkways, and a raised landscape median. The project <br />will also include sound walls adjacent to residential parcels, water and sewer main <br />improvements, and storm drain improvements to assure adequate drainage. Once completed, <br />23A-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.