My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
55B - RESO - SCAG GRANT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2017
>
07/05/2017
>
55B - RESO - SCAG GRANT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2017 2:58:36 PM
Creation date
6/29/2017 2:48:00 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
55B
Date
7/5/2017
Destruction Year
2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RFP No. 16-xxx <br />General Plan Videos (PS6) <br />Create four (4) separate videos to summarize various General Plan work efforts. Each video <br />to be three to five minutes in length. While General Plan Video image and video clips and/or <br />interviews to be provided by consultant, existing City photo and images to be made available <br />to consultant. Spanish and Vietnamese subtitles are to be provided for each video <br />production. <br />Urban Design (PS7) <br />Provide graphic support to illustrate proposed Urban Design policies and programs. <br />Graphic Design and Document Support (PS8) <br />Provide graphic design support for General Plan document layout and graphics. Under the <br />direction of staff, assist in refining the General Plan layout, graphics and text editing; as well <br />as suggestions for visually interesting content for the General Plan webpage to promote <br />community engagement and understanding of the General Plan Update. <br />The Consultant shall provide technical and planning services under the direction of City staff. <br />The Consultant will be expected to provide experienced and knowledgeable professional <br />staff. The Consultants' Project Manager and staff shall be responsive and maintain excellent <br />working relationships with City staff, project applicant, property owners, and/or developer. <br />The Consultant shall be committed to provide adequate staffing levels at all times in order to <br />adhere to established schedules. The Consultant shall be knowledgeable and expected to <br />be familiar with federal, state and local regulations, policies and procedures as they pertain <br />to all planning studies. In addition, all documentation shall remain consistent with established <br />guidelines provided by the. Office of Planning and Research (OPR. <br />It shall be the responsibility of the selected consultant to prepare the planning study or service <br />that complies with the OPR General Plan Guidelines, as appropriate. As part of the proposed <br />General Plan and Envisioning Sustainability planning studies and documentation, the <br />following shall be addressed. . <br />A. Initiation of the Project/Kick-Off: Attend a kick-off meeting to discuss the project <br />with City staff within five working days of receiving a notice to proceed. At this time, <br />staff will present any additional information about the project, discuss any project <br />constraints and issues, and refine the scope and responsibilities. <br />B. Attendance at Meetings: The scope of services requires the selected consultant to <br />work closely with staff in preparing the planning studies and draft element document. <br />The consultant shall budget (at minimum) attendance at the following meetings: <br />One (1) Kick-off meeting with City staff <br />Progress site meetings and progress conference call meetings every other week <br />(as needed based on project scope) <br />In addition, consultants assisting with the Existing Land Use and Build Out Analysis <br />(PS1) and/or Market and Fiscal Analysis (PS2) and Green and Complete Public Realm <br />6/15/17 <br />55B-9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.