My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ACCO ENGINEERED SYSTEMS-2017
Clerk
>
Contracts / Agreements
>
A
>
ACCO ENGINEERED SYSTEMS-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2017 4:36:07 PM
Creation date
7/5/2017 12:54:15 PM
Metadata
Fields
Template:
Contracts
Company Name
ACCO ENGINEERED SYSTEMS
Contract #
A-2017-158
Agency
Public Works
Council Approval Date
6/20/2017
Expiration Date
12/31/2017
Insurance Exp Date
10/1/2017
Destruction Year
0
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A - Contractor Agreement <br />SARTC - HVAC Replacement <br />Appendix <br />ATTACHM , NT I <br />SCOPE OF WORK <br />CITY Or SANTA. ANA <br />REQUEST FOR PROPOSALS <br />,FOR <br />HVAC REPLACEMENT AT SARTC <br />RFP NO.: 17-05,6 <br />Introduction and 13acicground: <br />SANTA ANA U090 4L TRANSPORTATION CE + R <br />Tho Santa Ana Regional Transportation Centex (SARTC) is located at 1000 gnat Santa Ana <br />Boulevard, Ssurta Anna, CA 92701. '1110 facility covers 6,75 acresand contains a 47,000 -square <br />foot terminal, two, surface parlring lots with a total of 282 spaces, and one four-story parking <br />structure with 423 spaces, A three-story pedestrian bridge takes travelers to the east train <br />platform. A second pedestrian bridge connects the parking structure to the nrain facility, The <br />terminal building Is open from 5:00 AM to midnight daily, The parking structure is open to die <br />public ftom 4:00 AM to midnight daily, <br />The SARTC terminal building contains approximately 35,000 square feet of recital space, plus a <br />ftvo-story theme tower that includes small meeting/conference rooms on the 4'i' and 5a' floors. <br />Tenants include Amtrak, Greyhound Lines, 'ries 13strellas ole Oro, County of Orange Social <br />Services Program, State of California EDD, the City of Santa Ana Worlc Center, and gift shop, <br />Descrintion of Wo • c: <br />First floor 11VAC scope of work SARTC fan coil replacement job witli controls option upgrades <br />Units to be replaced: # 2;3,4;5,6,7,8,9,10,11,12,14, and 19 <br />Frei Coil Unit Reptacemont - Bgise 012tion <br />Contractors shall confirm unit identification Information on fan coil schedule to the actual <br />fan coil unit to insure the correct size unit is installed <br />• New fan coil units will have direct drive fan systems with ECM motors <br />v Now fan coil traits will come equipped with a new controller that has enough points to <br />satisfy 2016 Title 24, section 1201 j, and allow for additional future controls strategies, <br />sttolt as VAV to zones wlicre feasible, <br />o Install secondary stainless steel drain pans under fan coil units, condensate drains for <br />secondary pans and fan coil units including safety switch in secondary pan <br />• ]nstall new zone controls (PDC) for heating and cooling valves Including new <br />thermostats that are'Titie 24 compliant, and Auto-Domand. Response control onabled, see <br />Auto -DR section below. <br />Page <br />
The URL can be used to link to this page
Your browser does not support the video tag.