• Install new DDC control valves for hot water (3 -way valves) coils and chilled water (2. <br />wayvalves) coils to be integrated into existing control system <br />• Install new chilled water and hot water shut off ball valves (full port) to each unit <br />• Install now hot water and chilled water piping to coils as needed from new Isolation full <br />port ball valves Including hetes plugs on supply and return lines and hose bib on supply <br />piping at coil <br />• Reconnect electrical as par code <br />• Reinstall ductwork and replace if required, provide duct sealing where required by Title <br />24. <br />• -install water balancing valves on.ohilled water and hot, water at each fan coil. <br />• Certified water balance eaolz fan coil and supply the City of Santa Ana with report <br />• Certified air report to confirm the design CPM at tan coil units per fan coil schedule on <br />prints and supply the City of Santa Ana with report <br />a Supply the City of Santa Ana with all submittal information <br />• All work to be permitted per city code: and inspections scheduled by contractor <br />• Label new units and thermostats with plastic tags <br />• Provide diagram showing association of thermostat to fan coil units <br />• Supply the City of Santa Alza with drawings (red line or architectural draft) <br />• This applies to units, 2, 3, 4, S, G, 7, 8,10 and 11. The contractor will have one line item <br />price to remove these twits and Install new traits in proforred locations (see prints) fund <br />one line item price to abandon the old units in place and Install new units in preferred <br />locations <br />• If the units that are relocated need penetrations through fire wall the penetrations will. <br />need to be properly sealed with fire caulking per code. If duct penetrations are needed <br />install fire dampers per code and fire caulk per code. <br />o Compliance with buy American act <br />• Contractor is responsible for all engineering costs <br />• DIR and prevailing wage required <br />• Contractor will provide copies of all applicable licenses along with submitted proposals, <br />Including the following at a minimum; <br />a. C-20—I-IVAC Contractor License <br />b. C-7 - Low'Voltage Systems Contractor License <br />c, C-10 —Electrical Contractor License <br />Auto -Demand Re no e Thermostats — Pricing to be provided by Cogp3qqLM.G ' A <br />Contractor is to provide this pricing as incremental cost, In other words, the cost beyond Base <br />Option. <br />The now thermostats (one per fan coil) shall be capable of connecting to the networic to <br />be able to receive automated demand response (Auto -DR) signals from the utility <br />provider, Southern California Edison (SCE) during specific periods as determined by the <br />utility provider. <br />City of Sentra Ana RPP 97.066 <br />Page Al .2 <br />