Santa Ana/Garden Grove Fixed Guideway Project Addendum <br />Hazardous Materials <br />The potential hazardous materials impacts associated with the construction and operation of the Project was <br />evaluated in the EIR. Since the certification of the EIR, there have been no changes to the hazardous materials <br />environment or changes to the characteristics of the proposed project as evaluated in the EIR that would affect <br />hazardous materials. As previously identified in the EIR, the Project would require limited acquisition or property <br />which could have the potential to contain hazardous materials. Three properties identified as potentially hazardous <br />sites would be acquired as part of Operations & Maintenance (0&M) Facility Site B (which is the currently proposed <br />location for the 0&M facility). As described in the EIR, a detailed Phase I Environmental Site Assessment would be <br />required to ascertain if employees working at the 0&M Facility would be exposed to toxic levels of hazardous <br />materials. The EIR recommended implementation of Mitigation Measure HAZ1 to reduce this potential impact to a <br />level less than significant. Because the proposed design modifications do not involve a change with respect to the <br />location of the proposed 0&M Facility Site B, the conclusions regarding hazardous materials would remain the same. <br />The EIR indicates that operation of the streetcar along the Project alignment would not involve the use of hazardous <br />materials. As stated previously, no change to streetcar maintenance activities is proposed as part of the design <br />modifications, therefore, no new significant impact or the increase in the severity of a significant impact would result. <br />The conclusions that the potential hazardous materials impact would be reduced to a level of less than significant <br />with the implementation of Mitigation Measure HAZ1 as identified in the EIR remain accurate. <br />Traffic and Parking <br />The potential traffic and parking related impacts associated with the construction and operation of the proposed <br />Project were evaluated in the EIR. <br />Since the certification of the EIR, there have been some changes to the transportation network within the Project <br />area. Also, as described under "Description of Design Modifications," some of the design modifications were <br />determined to have the potential to impact traffic, and further analysis was warranted. <br />In order to address the potential traffic impacts associated with the design modifications, an addendum to the <br />previously -prepared traffic study, which was provided as Appendix I to the EIR was prepared (see OC Streetcar <br />Santa Ana -Garden Grove Project Traffic Study Addendum provided in Appendix C). The purpose of the analysis was <br />to identify any changes to traffic impacts that were previously disclosed in the EIR, due to several design <br />modifications with the advancement of engineering since the Project (and conceptual design) was approved in 2015. <br />The five design modifications addressed in the addendum to the traffic analysis consists of <br />• Reclassification of Santa Ana Boulevard <br />• Relocation of Santa Ana Boulevard Stations <br />• Fairview Street Grade Crossing Analysis <br />• Traffic Signal Priority for the Streetcar <br />• Street Design Concept for Santa Ana Boulevard <br />The supplemental traffic analysis was prepared in accordance with City of Santa Ana requirements and the Orange <br />County Congestion Management Program (CMP) (OCTA 2015) requirements. <br />Reclassification of Santa Ana Boulevard. Santa Ana Boulevard between Raiff Street and Shelton Street would be <br />reclassified from a four -lane undivided roadway to a two-lane roadway (divided with a center left turn lane or raised <br />median with left -turn pockets). Table 3-1 of the supplemental traffic analysis (see Appendix C), provides the <br />9 1 P age 1170726.1 <br />