My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-046 - Approving Addendum Nos. 1 and 2
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2017
>
2017-046 - Approving Addendum Nos. 1 and 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2017 3:00:08 PM
Creation date
7/11/2017 9:25:32 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2017-046
Date
7/5/2017
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
809
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Santa Ana/Garden Grove Fixed Guideway Project Addendum <br />Project alignment, such that no new significant impacts and no increase in the severity of an impact would result as <br />compared to the originally approved Project and as evaluated in the EIR. <br />The proposed modifications that have been determined to have the potential to affect noise and vibration levels and <br />were studied in detail in the Supplemental Noise and Vibration Analysis (Appendix D) include physical improvements <br />and operational modifications. <br />Physical Improvements: <br />Alignment Shift. Repositioning the double track alignment within the PE ROW is proposed. This <br />modification would shift the railroad centerline within the PE ROW to the north. <br />Changes to Special Trackwork. Placement of single crossovers on both sides of the maintenance <br />and storage facility (MSF), changed layout for MSF, added crossovers on both sides of downtown <br />couplet, and replacement of the tail track beyond the SAR Transit Center (SARTC) platform with a <br />double -crossover before the SARTC platform is proposed. <br />Operational Modifications: <br />• Increase in Speed. Increasing the maximum speed within the PE ROW from 35 miles per hour (mph) <br />to 45 mph, and <br />• Traffic Signal Priority. Implementation of traffic signal priority at all traffic signals along the route <br />except for Main Street, Broadway, and Bristol Street is proposed. <br />Noise Analysis of Increased Speed and Alignment Shift <br />As described in Appendix D, the impacts associated with the increase in speed combined with the alignment shift are <br />the same as those for the original Project with the exception of at receivers R1 (located within NSA 1), R4 (located <br />within NSA 2), R7 (located within NSA 3), and R8 (located within NSA 4). With the proposed modifications, receivers <br />R1 and R4 would be exposed to moderate noise impacts. At receiver R7 the noise level would worsen from a <br />moderate impact to a severe impact without mitigation as compared to the original Project. At receiver R8 the noise <br />level improved, as it would be reduced from a severe impact under the original Project, to a moderate impact under <br />the currently modified Project. <br />The February 2012 noise and vibration technical report provided as an appendix to the EIR, recommended the <br />following measures to reduce the severe impacts: 1) wayside noise barriers, 2) horn sounding exemption at grade <br />crossings, and, 3) special trackwork devices. The currently proposed Project plans call for the use of flange bearing <br />frogs at all crossovers. Therefore, no further measures are required for the special trackwork. <br />The 2012 noise analysis evaluation provided in the EIR identified the need for noise barriers for receptor locations <br />R10, R12, R13, and R14. Due to the change in train speed, elevation, and the shift in centerline an additional <br />wayside noise barrier would be required to reduce the noise level in the vicinity of receptor R7 (located in NSA 3). <br />Noise levels at receivers R7 and R14 would be reduced to moderate after the implementation of the proposed design <br />feature, which is consistent with the previously -adopted Mitigation Measure N-3. <br />If a horn sounding exemption is established and approved at each crossing, the required use of warning horns would <br />be exempted and horns would not be sounded except in an emergency situation. Based on the supplemental noise <br />and vibration analysis, noise levels at receivers R10 and R13 would be reduced to a moderate impact after the <br />implementation of the proposed mitigation measure. This measure was previously identified in the EIR, and the <br />supplemental analysis demonstrates that the proposed modification does not change the previously -adopted <br />mitigation measure. <br />111P age 1170726.1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.