Laserfiche WebLink
Santa Ana - Garden Grove Streetcar Project <br />Traffic Study Addendum <br />3.4.2 Intersection ICU Analysis <br />Based on the HCM analysis above, the average delay increase (in seconds) for all non -streetcar movements was <br />calculated to be 15 percent. Similarly, all intersection movements that corresponded with the streetcar movements <br />(i.e., eastbound and westbound through movements at affected intersections) experienced an average delay <br />decrease of 15 percent. In order to translate these delay increases/decreases into the ICU methodology, the <br />capacity for each movement was adjusted accordingly. For example, at the intersection of Santa Ana <br />Boulevard/Pacific Avenue, the eastbound and westbound through lane capacity (where the streetcar travels) was <br />increased by 15 percent to reflect the reduction in delay due to transit signal priority. Conversely, all the other <br />intersection movements (northbound/southbound and other turning movements) were effectively decreased by <br />15 percent to reflect the added delay experienced by non -streetcar movements during a preemption event. <br />Table 3-8 Intersection LOS Summary - Transit Signal Priority ICU Methodology <br />Notes: ICU - intersection capacity utilization (volume -to -capacity ratio) * Includes proposed Santa Ana Boulevard <br />reclassification (reduction in eastbound and westbound through lanes from 4lanes to 2 lanes). <br />'Traffic Impact Assessment (October 2012). <br />' Includes capacity adjustments (increase in capacity for streetcar movements, decrease in capacity for all other movements). <br />As shown in Table 3-8, the application of TSP (increase in capacity by 15 percent for streetcar movements with a <br />reduction in capacity by 15 percent for all other movements) to all the affected intersections would not result in <br />any deterioration of LOS from acceptable to unacceptable. Throughout the streetcar alignment, TSP would result <br />in a 0.01 decrease in ICU during the both the AM and PM peak hours. Detailed ICU worksheets are provided in <br />Appendix E. <br />FF Previous Analysis <br />2035 Streetcar <br />Conditions' <br />Transit Signal Priority <br />2035 Streetcar <br />Conditionsz <br />Delta <br />AM Peak PM Peak <br />Hour Hour <br />AM Peak <br />Hour <br />PM Peak <br />Hour <br />ID <br />Main St <br />Cross St <br />ICU <br />LOS <br />ICU <br />LOS <br />ICU <br />LOS <br />ICU <br />LOS <br />1* <br />Santa Ana Blvd <br />Raitt St <br />0.61 <br />B <br />0.89 <br />D <br />0.61 <br />B <br />0.85 <br />D <br />+0.01 <br />-0.04 <br />2* <br />Santa Ana Blvd <br />Pacific Ave <br />0.33 <br />A <br />0.58 <br />A <br />0.33 <br />A <br />0.55 <br />A <br />+0.01 <br />-0.03 <br />3* <br />Santa Ana Blvd <br />Shelton St <br />0.46 <br />A <br />0.60 <br />B <br />0.46 <br />A <br />0.55 <br />A <br />0 <br />-0.05 <br />4 <br />Santa Ana Blvd <br />Flower St <br />0.67 <br />B <br />0.63 <br />B <br />0.66 <br />B <br />0.61 <br />B <br />-0.01 <br />-0.02 <br />5 <br />Santa Ana Blvd <br />Parton St <br />0.47 <br />A <br />0.43 <br />A <br />0.47 <br />A <br />0.43 <br />A <br />0 <br />0 <br />6 <br />Santa Ana Blvd <br />Ross St <br />0.61 <br />B <br />0.47 <br />A <br />0.59 <br />A <br />0.46 <br />A <br />-0.02 <br />-0.01 <br />7 <br />Santa Ana Blvd <br />Bush St <br />0.43 <br />A <br />0.55 <br />A <br />0.43 <br />A <br />0.55 <br />A <br />0 <br />0 <br />8 <br />Santa Ana Blvd <br />French St <br />0.67 <br />B <br />0.73 <br />C <br />0.67 <br />B <br />0.74 <br />C <br />0 <br />+0.01 <br />9 <br />Santa Ana Blvd <br />Lacy St <br />0.75 <br />C <br />0.57 <br />A <br />0.76 <br />C <br />0.57 <br />A <br />+0.01 <br />0 <br />10 <br />Santa Ana Blvd <br />Santiago St <br />0.53 <br />A <br />0.64 <br />B <br />0.49 <br />A <br />0.65 <br />B <br />-0.04 <br />+0.01 <br />11 <br />4" St <br />Bush St <br />0.39 <br />A <br />0.5 <br />A <br />0.53 <br />A <br />0 <br />+0.01 <br />12 <br />4th St <br />French St <br />0.45 <br />A <br />0.4 <br />A <br />0.46 <br />A <br />+0.01 <br />-0.03 <br />13 <br />4th St <br />Mortimer St <br />0.45 <br />A <br />0.64= <br />A <br />0.65 <br />B <br />-0.02 <br />+0.01 <br />Notes: ICU - intersection capacity utilization (volume -to -capacity ratio) * Includes proposed Santa Ana Boulevard <br />reclassification (reduction in eastbound and westbound through lanes from 4lanes to 2 lanes). <br />'Traffic Impact Assessment (October 2012). <br />' Includes capacity adjustments (increase in capacity for streetcar movements, decrease in capacity for all other movements). <br />As shown in Table 3-8, the application of TSP (increase in capacity by 15 percent for streetcar movements with a <br />reduction in capacity by 15 percent for all other movements) to all the affected intersections would not result in <br />any deterioration of LOS from acceptable to unacceptable. Throughout the streetcar alignment, TSP would result <br />in a 0.01 decrease in ICU during the both the AM and PM peak hours. Detailed ICU worksheets are provided in <br />Appendix E. <br />