My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-046 - Approving Addendum Nos. 1 and 2
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2017
>
2017-046 - Approving Addendum Nos. 1 and 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2017 3:00:08 PM
Creation date
7/11/2017 9:25:32 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2017-046
Date
7/5/2017
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
809
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Santa Ana — Garden Grove Streetcar Project <br />Traffic Study Addendum <br />4.0 Mitigation Measures <br />This section includes recommendations to mitigate any impacts identified from the intersection analysis presented <br />in this report for each of the proposed project modifications and additional analysis. <br />4.1 Santa Ana Boulevard Reclassification Mitigation Measures <br />The results of the intersection and roadway segment LOS analysis with and without the proposed reclassification of <br />Santa Ana Boulevard from a four -lane divided roadway to a two-lane divided roadway determined that no impacts <br />to the affected intersections are anticipated. <br />4.2 Santa Ana Boulevard Station Relocation Mitigation Measures <br />The results of the intersection LOS analysis with and without the proposed relocation of stations determined that <br />no impacts are anticipated. <br />4.3 Fairview Grade Crossing Mitigation Measures <br />The results of the intersection LOS analysis with and without the proposed grade crossing determined that no <br />impacts are anticipated. The affected intersections would only require minor signal timing adjustments. No design <br />modifications are anticipated. <br />4.4 Transit Signal Priority Mitigation Measures <br />The results of the intersection LOS analysis with and without implementation of transit signal priority at the affected <br />intersections determined that no impacts are anticipated. <br />4.5 Street Design Concept Mitigation Measures <br />The results of the intersection LOS analysis with and without implementation of the new street design concept <br />determined that a significant impact would occur at Santa Ana Boulevard/Raitt Street. Mitigation measures to <br />improve this location would be the addition of a second westbound left -turn lane, as way analyzed in the Traffic <br />Impact Assessment. <br />® 19 <br />f�� <br />
The URL can be used to link to this page
Your browser does not support the video tag.