Laserfiche WebLink
Santa Ana — Garden Grove Streetcar Project <br />Traffic Study Addendum <br />5.0 Conclusions <br />The Traffic Study Addendum to the May 2014 EA/DEIR evaluated proposed Project modifications and required <br />additional analysis scenarios to determine if new impacts would occur. Based on the results of the Traffic Study <br />Addendum, all proposed Project modifications (Santa Ana Boulevard Reclassification, Santa Ana Boulevard Station <br />Relocation, Fairview Street Grade Crossing, and Transit Signal Priority) can be implemented without causing any <br />impacts beyond those disclosed in the EA/DEIR. <br />® 20 <br />f�� <br />