Laserfiche WebLink
Santa Ana/Garden Grove Fixed Guideway Project Addendum <br />Findings from Environmental Re-evaluation <br />(1). Substantial changes are not proposed for the project that will require major revisions of the <br />previous EIR due to the involvement of new, significant environmental effects or a substantial <br />increase in the severity of previously identified effects. <br />Substantial changes have not occurred with respect to the circumstances under which the Project was undertaken, <br />that would require major revisions to the Project EIR. Since certification of the Project EIR in January 2015, there <br />have been no major updates to the CEQA Guidelines or adoption of new legislation requiring additional <br />environmental analysis. Therefore, no proposed changes or revisions to the EIR are required. In addition, all <br />previously adopted mitigation measures are incorporated herein by reference. <br />(2). Substantial changes have not occurred with respect to the circumstances under which the project is <br />undertaken, that would require major revisions of the previous EIR due to the involvement of new <br />significant environmental effects or a substantial increase in the severity of previously identified <br />significant effects. <br />As described in the preceding text for each environmental issue area, no substantial changes have occurred with <br />respect to the circumstances under which the proposed Project design modifications would be undertaken that would <br />suggest that its adoption and implementation would result in any new significant environmental effects or a <br />substantial increase in the seventy of the previously identified significant effects not previously discussed in the <br />certified Project EIR would occur. Therefore, no proposed changes or revisions to the EIR are required. In addition, <br />all previously adopted mitigation measures presented in the Project EIR are incorporated herein by reference and <br />would be implemented in compliance with the adopted MMRP for the Project. <br />(3). No new information has been provided, which was not known and could not have been known with <br />the exercise of reasonable diligence at the time the previous EIR was certified as complete that <br />would indicate that the proposed project would result in one or more signiricant effects not <br />discussed in the previous EIR, significant effects would be substantially more severe, mitigation <br />measures or altematives previously found to be infeasible would in fact be feasible, or mitigation <br />measures or alternatives which are considerably different from those analyzed in the previous EIR <br />would substantially reduce one or more significant effects on the environment, but the project <br />proponent declines to adopt the mitigation measure or alternative. <br />There is nothing in the proposed Project design modifications that would suggest that its adoption and <br />implementation would result in any new significant environmental effects or the increase in the severity of an <br />environmental effect not previously discussed in the Project EIR. Therefore, no proposed changes or revisions to the <br />EIR are required. In addition, all previously adopted mitigation measures presented in the Project EIR are <br />incorporated herein by reference and would be implemented in compliance with the adopted MMRP for the Project. <br />6. CONCLUSIONS <br />Based on the findings and information contained in the previously -certified Project EIR, the analysis above, the <br />CEQA statute and State CEQA Guidelines, including Sections 15164 and 15162, the proposed design modifications <br />will not result in any new, increased, or substantially different impacts, other than those previously considered and <br />addressed in the Project EIR. No changes or additions to the Project EIR analyses are necessary, nor is there a need <br />for any additional mitigation measures. Therefore, a Supplemental EIR is not required. This Addendum to the EIR is <br />the appropriate environmental documentation for the proposed modifications to the Project. <br />161P age 1170726.1 <br />