My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-046 - Approving Addendum Nos. 1 and 2
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2017
>
2017-046 - Approving Addendum Nos. 1 and 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2017 3:00:08 PM
Creation date
7/11/2017 9:25:32 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2017-046
Date
7/5/2017
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
809
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F31J� OCTA I Santa Ana/Garden Grove Fixed Guideway Project <br />Visual Impact Analysis Re-evaluation Technical Memo <br />• Addition of abridge span on the west bank of the SAR, behind an existing levee to <br />accommodate an undercrossing for the SAR Trail and Bikeway(and Orange County <br />Flood Control District (OCFCD) maintenance road). The profile of the trail and <br />maintenance road would be modified to facilitate the grade separation; <br />• Relocation of the traction power substations (TPSS) to the PE ROWand publically <br />owned properties and reducing the number of TPSS from sixto four; and, <br />• Change from single contact wire in the PE ROWto a two -wire catenaryto enhance <br />operations at higher speed. <br />Supplemental Visual Impact Analysis <br />The 2012 Visual Impact Assessment thatwas included in AppendixEofthe 2015 ENEIR <br />organized the project into three segments for purposes ofevaluating potential Visual impacts. <br />These segments consisted of Segment 1: PE ROW, Segment 2: Flower to Raitt Street, and <br />Segment 3: Flower to Santa Ana Regional Transit Center (See Figure 1, EA Alignment <br />Segments forVisual Impact Assessment). The segments were further subdivided into Visual <br />Character Areas (A to J). <br />Figure 1 — EA Alignment Segments for Visual Impact Assessment <br />SEGMENT i:PE ROW SEGMENT 3:STREETCAR ALTERNA TIVES <br />1 & 2 - FLOWER TO SARTC <br />.SEGME 3@. STNEETCM AL NkT1YE9 q <br />EGMEMF �:STREETCARALTERNATI E1•. <br />Pcten9alO8Y <br />Faci@F.al ty(OSM <br />Fac[thy iSke 0) SIm A) <br />j <br />i SEGMENT 2: FLOWER TO RAITT STREET <br />t <br />LCGCNG. Q suarwe. <br />�s:scae�aaMni.mra <br />C noommsm <br />IoaR� <br />Design modifications described above are located within Segment 1 for (1) the Westminster <br />Avenue Bridge; (2) the Santa Ana River Bridge; (3) realignment of the track and change from <br />one to two -wire catenaryin the Pacific Electric right ofway(PE ROW) and (4) repositioning of <br />Traction Power Substations (TPSS) (1) and (2). The repositioning of TPSS (3) and (4) are <br />located within Segment 3. <br />21 Page <br />
The URL can be used to link to this page
Your browser does not support the video tag.