Laserfiche WebLink
Queues 2035 HNTB Design Concept <br />36: French & Santa Ana PM Peak Hour Queues <br />Lane Group <br />WBT <br />NBT <br />SBT <br />Lane Group Flow (vph) <br />946 <br />191 <br />48 <br />v/c Ratio <br />0.67 <br />0.32 <br />0.07 <br />Control Delay <br />13.9 <br />9.2 <br />8.0 <br />Queue Delay <br />0.0 <br />0.0 <br />0.0 <br />Total Delay <br />13.9 <br />9.2 <br />8.0 <br />Queue Length 50th (ft) <br />98 <br />30 <br />6 <br />Queue Length 95th (ft) <br />150 <br />55 <br />20 <br />Internal Link Dist(ft) <br />843 <br />494 <br />453 <br />Tum Bay Length (ft) <br />Base Capacity (vph) <br />1411 <br />594 <br />737 <br />Starvation Cap Reductn <br />0 <br />0 <br />0 <br />Spillback Cap Reductn <br />0 <br />0 <br />0 <br />Storage Cap Reductn <br />0 <br />0 <br />0 <br />Reduced v/c Ratio <br />0.67 <br />0.32 <br />0.07 <br />Intersection Summary <br />7/2/2015 Baseline Synchro 9 Report <br />Page 16 <br />