My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-046 - Approving Addendum Nos. 1 and 2
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2017
>
2017-046 - Approving Addendum Nos. 1 and 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2017 3:00:08 PM
Creation date
7/11/2017 9:25:32 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2017-046
Date
7/5/2017
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
809
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0� OCTA I Santa Ana/Garden Grove Fixed Guideway Project <br />Noise and Vibration Technical Analysis Re-evaluation in Support of Minor Design Modifications <br />Table 1. Comparison of 2015 Approved Project and Proposed 2016 Minor Design <br />Modifications <br />LPA in Certified EA/EIR — January 2015 <br />30% Design — May 2016 <br />Single-track bridge across the Santa Ana <br />Double -track bridge across the Santa Ana <br />River south of the existing historic bridge. <br />River; north of the existing historic bridge. <br />The double -track bridge is the same distance <br />away from the historic bridge as the single- <br />track bridge. <br />Track positioned in the center of the PE ROW <br />Track shifted to the northern side of the PE <br />ROW, no private property is required. <br />At -grade Santa Ana River Trail crossing on <br />Provision of a Santa Ana River Trail <br />the West Bank. <br />undercrossing at the West Bank by including <br />an extra span on the Santa Ana River bridge <br />Streetcar Maximum Speed of 35 mph in PE <br />Streetcar Maximum Speed of 45 mph in PE <br />ROW. <br />ROW <br />Willowick Station Stop within PE ROW. <br />No Willowick Station Stop within PE ROW. <br />Side platforms at Harbor Blvd., Fairview St. <br />Center platforms at Harbor Blvd., Fairview St., <br />(staggered, farside), and Raitt St., farside <br />and Raitt St., nearside Bristol St. westbound, <br />Bristol St. eastbound, farside Ross St. <br />nearside Ross St. westbound, stops at <br />westbound, stops at Broadway and Main. <br />Sycamore (farside westbound, farside <br />eastbound), No private property is required for <br />the platforms. <br />Double crossover west of maintenance and <br />Single crossovers on both sides of the MSF, <br />storage facility (MSF), turnout and tail track <br />revised MSF track layout, single crossovers <br />beyond Santa Ana Regional Transportation <br />on both ends of downtown couplet, double - <br />Center (SARTC) platform. <br />crossover prior to SARTC platform. <br />No consideration for traffic signal priority for <br />Traffic signal priority at all traffic signals along <br />the streetcar. <br />the route except for Main St., Broadway, and <br />Bristol St. The TSP extends a green phase or <br />shortens an opposing green phase by as <br />much as 20 seconds, <br />Tied -Arch Bridge at Westminster Avenue <br />Concrete Box Girder Bridge at Westminster <br />Avenue <br />Santa Ana Blvd. from Flower St. to Raitt St. <br />Santa Ana Blvd from Flower St. to Raitt <br />maintained as a four -lane street (two lanes in <br />St. with a raised 4 -ft median and re -striped as <br />each direction with streetcar in the outside <br />a two-lane street (one lane in each direction) <br />lanes). <br />with left and U-turns allowed only at signalized <br />intersections and striped bike lanes. No <br />private property is required. <br />Santa Ana Blvd. from French St. to Flower St. <br />Santa Ana Blvd. from French St. to Flower St. <br />with three -lanes westbound. <br />with two -lanes westbound and a protected <br />bike lane on the north side of the street. No <br />private property is required. <br />Six traction power substations (TPSS) located <br />Elimination of two TPSS to result in a total of <br />at the following locations: <br />four TPSS for the Project, with the following <br />(1) At Harbor Blvd.; <br />revised locations. No private property is <br />(2) At Susan St. (outside PE ROW), <br />required: <br />(3) On east side of Santa Ana River <br />(1) On south side of Westminster Ave in <br />(outside of PE ROW), <br />the PE ROW, <br />(4) At Pacific Ave.; <br />1 (2) At the Maintenance and Storage <br />18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.