Laserfiche WebLink
OCTA I Santa Ana/Garden Grove Fixed Guideway Project <br />FNNoise and Vibration Technical Analysis Re-evaluation in Support of Minor Design Modifications <br />LPA in Certified EA/EIR — January 2015 <br />30% Design — May 2016 <br />(5) In a parking structure at 5`" and Main, <br />Facility (MSF) site, <br />and <br />(3) On north side of Santa Ava Blvd east <br />(6) On south side of Santa Ana Blvd at <br />of Parton St., and <br />Garfield St. <br />(4) On north side of Santa Ana Blvd and <br />N. Garfield St. <br />Locations 1 and 2 are within the ROW <br />previously cleared. Locations 3 and 4 are <br />identified within the updated APE. <br />Appendix P to the EIR, the Drainage <br />Modification of scope of drainage <br />Technical Report, indicate storm drain <br />improvements to rely less on connections to <br />improvements on many streets outside the <br />storm drain network and use surface <br />project alignment. <br />conveyance in streets to maintain existing <br />drainage patterns to the maximum extent <br />practicable while addressing surface storm <br />water drainage needs generated by the <br />Project or change in drainage patterns caused <br />solely by the Project. <br />Single contact wire in the PE ROW. <br />Two -wire catenary in the PE ROW. <br />No provision for underground fiber optics <br />Underground fiber optics cable <br />cable <br />(communications) from SARTC to OCTA <br />Garden Grove Bus Annex north of PE ROW, <br />approximately 1500 feet west of Harbor Blvd. <br />The Project footprint and Area of Potential Effect (APE) for Cultural Resources study were also <br />updated to encompass the modifications as well as the anticipated revised construction limits of <br />the Project. <br />Physical Improvements: The design modifications would result in the following changes to the <br />physical improvements described in the LPA: <br />• Concrete Box Girder bridge instead of a Tied -Arch bridge at Westminster Avenue; <br />• A double track bridge instead of a single track bridge across the Santa Ana River <br />(SAR). The position of the bridge would be north instead of south of the existing <br />historic bridge location. <br />• Repositioning the double track alignment, shifting the railroad centerline within the <br />former Pacific Electric right-of-way (PE ROW) from the middle to the north at the <br />approaches to the SAR crossing; <br />• Addition of a bridge span on the west bank of the SAR, behind a existing levee to <br />accommodate an undercrossing for the SAR Trail and Bikeway (and Orange County <br />Flood Control District (OCFCD) maintenance road. The profile of the trail and <br />maintenance road would be modified at the crossing to facilitate the grade separation; <br />• Deletion of Willowick Station Stop. This station stop is associated with future <br />development. At this time there is no development that is accessible to this station <br />stop; <br />• Repositioning of Station Stop side platforms to center platforms at Harbor Boulevard, <br />Fairview Street (both west side), and Raitt Street in the PE ROW segment of the <br />Project alignment; <br />19 <br />