My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-046 - Approving Addendum Nos. 1 and 2
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2017
>
2017-046 - Approving Addendum Nos. 1 and 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2017 3:00:08 PM
Creation date
7/11/2017 9:25:32 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2017-046
Date
7/5/2017
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
809
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0� OCTA I Santa Ana/Garden Grove Fixed Guideway Project <br />Noise and Vibration Technical Analysis Re-evaluation in Support of Minor Design Modifications <br />• Repositioning Station Stop westbound platform at Ross Street from farside to nearside, <br />and Station Stop platforms at Broadway and Main consolidated and moved to farside <br />Sycamore Street; <br />• Placement of single crossovers on both sides of the Maintenance and Storage Facility <br />(MSF) with a revised layout for the MSF, added crossovers on both sides of downtown <br />couplet, and replaced the tail track beyond the SARTC platform with a double crossover <br />before the SARTC platform; <br />• Restriping Santa Ana Boulevard from Flower Street to Raitt Street from a four -lane to a <br />two-lane street with a raised 4 -ft median; <br />• Restriping westbound Santa Ana Boulevard from French Street to Flower Street from <br />three -lanes to two -lanes and a protected bike lane on the north side of the street; <br />• Relocation of the traction power substations (TPSS) to the PE ROW and publically <br />owned properties and reducing the number of TPSS from six to four; <br />• Re-evaluation of the scope of drainage improvements to mitigate additional surface <br />storm water drainage needs generated by the Project, or change in drainage patterns <br />caused solely by the Project; <br />• Changing from single contact wire in the PE ROW to a two -wire catenary to enhance <br />operations at higher speed; and <br />• Consideration of underground fiber optic lines from SARTC to the OCTA Garden Grove <br />Bus Annex north of the PE ROW, about 1500 feet west of Harbor Blvd. <br />Operational Improvements: Two changes to the Project's operations are proposed as part of the <br />modifications: <br />• Increasing the maximum speed within the PE ROW from 35 miles per hour (mph) to 45 <br />mph. The increased speed reduces travel time, providing operational cost and ridership <br />benefits; and, <br />• Implementation of traffic signal priority at all traffic signals along the route except for <br />Main Street, Broadway, and Bristol Street. <br />20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.