Laserfiche WebLink
+� OCTA I Santa Ana/Garden Grove Fixed Guideway Project <br />J Visual Impact Analysis Re-evaluation Technical Memo <br />yam <br />TPSS Locations — Segment 1 and Segment 3 <br />k <br />In the LPA, a total ofsixTPSS facilities were proposed to be located at (1) Harbor Bloulevard <br />(2) Susan Street (outside of PE ROW) (3) east side of Santa Ana River (outside of PE ROW) (4) <br />PacificAwnue (5) in parking structure at5th and Main Street, and (6) on south side of Santa <br />Ana Boulevard at Garfield Street. The design modification decision to reduce the number of <br />TPSS sites from sixto fourwas made during the preliminaryengineering (30% design) phase of <br />the project. This resulted from consultation with Southern California Edison on power supply <br />feeder locations to TPSS sites and completion of a load flow analysis for the streetcar power <br />distribution network. <br />30% design TPSS sites are proposed to be located (1) on the south side of Westminster <br />Avenue in PE ROW (2) at the Maintenance and Storage Facilityon the former SA Recycling <br />yard (3) in Cityof Santa Ana parking loton the north side of Santa Ana Boulevard eastofParton <br />Streetand (4)on the north eastcornerofSanta Ana Boulevard and N. Garfield Street. Figure 8 <br />compares TPSS locations per LPA against the 30% design. <br />Figure 8 — TPSS Locations per LPAvs. TPSS Locations per 30%Design <br />91 Page <br />