Laserfiche WebLink
OCTA I Santa Ana/Garden Grove Fixed Guideway Project <br />FNNoise and Vibration Technical Addendum <br />operational improvements, and are partly derived from value engineering and risk workshops <br />conducted in 2015, as well as design coordination with OCTA's partner cities and stakeholders. <br />The modifications are not anticipated to result in changes to the maintenance plan for the <br />Project. <br />Proposed Minor Modifications/Engineering Refinement <br />The following describes the proposed additional design modifications that are the basis of <br />evaluation in this Addendum. Additionally, Table A provides a listing of design updates, <br />comparing the description of Project features in the EIR, revised description of Project features <br />resulting from design modifications at the 30% design, and additional modifications from the <br />60% design. <br />Table A. Project Description Comparison of Approved Project (2015 EIR), Modifications <br />(30% Design Revisions - May 2016) and Additional Modifications (60% Design Revisions <br />- December 2016) <br />2 <br />Project Description <br />Update <br />Approved Project in <br />ID <br />2015 EIR <br />30°%o Design - May 2016 <br />60% Desiqn - December 2016 <br />Double -track bridge across the <br />Single-track bridge across <br />Santa Ana River (SAR), north of the <br />1 <br />the Santa Ana River (SAR) <br />existing historic bridge. <br />No Change <br />south of the existing historic <br />The double -track bridge is the same <br />bridge. <br />distance away from the historic <br />bridge as the single-track bridge. <br />Track shifted to the center of <br />the PE ROW starting from <br />140 -ft east of SAR Bridge to <br />Track positioned in the <br />Track shifted to the northern side of <br />5th Street at -grade crossing <br />2 <br />center of the former Pacific <br />the PE ROW, no private property is <br />resulting in a slight track shift <br />Electric Right -of -Way (PE <br />required. <br />to the southern side of the PE <br />ROW). <br />ROW between 5 Street at - <br />grade crossing and the MSF, <br />no private property is <br />required. <br />Provision of a Santa Ana River <br />At -grade Santa Ana River <br />(SAR) Trail undercrossing at the <br />3 <br />(SAR) Trail crossing on the <br />West Bank by including an extra <br />No Change <br />West Bank. <br />span on the Santa Ana River (SAR) <br />bridge <br />Streetcar Maximum Speed <br />Streetcar Maximum Speed of 45 <br />Streetcar Maximum <br />4 <br />of 35 mph in PE ROW <br />mph in PE ROW <br />Operating Speed of 44 mph <br />in PE ROW <br />5 <br />Willowick Station Stop within <br />No Willowick Station Stop within the <br />No Change. <br />PE ROW. <br />PE ROW. <br />Side platforms at Harbor Blvd., <br />Center platforms at Harbor Blvd., <br />6 <br />Fairview St. (staggered, <br />Fairview St., and Raiff St., nearside <br />No Change <br />farside), and Raitt St., farside <br />Bristol St. westbound, nearside Ross <br />Bristol St. eastbound, farside <br />St. westbound, stops at Sycamore <br />2 <br />