Laserfiche WebLink
F31J� OCTA ISanta Ana/Garden Grove Streetcar Project <br />Cultural Resources Technical rvlamo Update <br />Table 1. Comparison of 2015 Approved Project and Proposed 2016 Minor Design <br />Modifications <br />LPA in Certified EA/EIR —January <br />30% Design —May 2016 <br />Figure/Appendix <br />2015 <br />Reference <br />Single-track bridge across the Santa <br />Double -track bridge across the Santa Ana <br />Figure 1 <br />Ana River south of the existing historic <br />River, north of the existing historic bridge. <br />bridge. <br />The double -track bridge is the same <br />distance away from the historic bridge as <br />the single-track bridge. <br />Track positioned in the center of the <br />Track shifted to the northern side of the PE <br />Appendix A <br />PE ROW <br />ROW, no private property is required. <br />At -grade Santa Ana Ricer Trail <br />Provision of a Santa Ana River Trail <br />Figure 2 <br />crossing on the West Bank. <br />undercrossing at the West Bank by <br />including an extra span on the Santa Ana <br />River bridge <br />Streetcar Maximum Speed of 35 mph <br />Streetcar Maximum Speed of 45 mph in PE <br />— <br />in PE ROW. <br />ROW <br />Willowick Station Stop within PE ROW. <br />No Willowick Station Stop within PE ROW. <br />Appendix A <br />Side platforms at Harbor Blvd., <br />Center platforms at Harbor Blvd., Fairview <br />Appendix A <br />Fairview St. (staggered, farside), and <br />St., and Raitt St., nearside Bristol St. <br />Raitt St., farside Bristol St. eastbound, <br />westbound, nearside Ross St. westbound, <br />farside Ross St. westbound, stops at <br />stops at Sycamore (farside westbound, <br />Broadway and Main. <br />farside eastbound), No private property is <br />required for the platforms. <br />Double crossover west of maintenance <br />Single crossovers on both sides of the MSF, <br />Appendix A <br />and storage facility (MSF), turnout and <br />revised MSF track layout, single crossovers <br />tail track beyond Santa Ana Regional <br />on both ends of downtown couplet, double - <br />Transportation Center (SARTC) <br />crossover prior to SARTC platform. <br />platform. <br />No consideration for traffic signal <br />Traffic signal priority at all traffic signals <br />Appendix A <br />priority for the streetcar. <br />along the route except for Main St., <br />Broadway, and Bristol St. The TSP extends <br />a green phase or shortens an opposing <br />green phase by as much as 20 seconds, <br />Tied -Arch Bridge at Westminster <br />Concrete Box Girder Bridge at Westminster <br />Figure 3, <br />Avenue <br />Avenue <br />Figure 4 <br />Santa Ana Blvd. from Flower St. to <br />Santa Ana Blvd from Flower St. to Raitt <br />Appendix A <br />Raitt St. maintained as a four -lane <br />St. with a raised 4 -ft median and re -striped <br />street (two lanes in each direction with <br />as a two-lane street (one lane in each <br />streetcar in the outside lanes). <br />direction) with left and U-tums allowed only <br />at signalized intersections and striped bike <br />lanes. No private property is required. <br />Santa Ana Blvd. from French St. to <br />Santa Ana Blvd. from French St. to Flower <br />Appendix A <br />Flower St. with three -lanes westbound. <br />St. with two -lanes westbound and a <br />protected bike lane on the north side of the <br />street. No private property is required. <br />Six traction power substations (TPSS) <br />Elimination of two TPSS to result in a total <br />Figure 5, <br />located at the following locations: <br />of four TPSS for the Project, with the <br />(1) At Harbor Blvd., <br />following revised locations. No private <br />(2) At Susan St. (outside PE <br />property is required: <br />July 8, 2016 1 4 <br />