My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-046 - Approving Addendum Nos. 1 and 2
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2017
>
2017-046 - Approving Addendum Nos. 1 and 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2017 3:00:08 PM
Creation date
7/11/2017 9:25:32 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2017-046
Date
7/5/2017
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
809
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
+� OCTAI Santa Ana/Garden Grove Streetcar Project <br />J Cultural Resources Technical Nlamo Update <br />LPA in Certified EA/EIR —January <br />30% Design—May2016 <br />Figure/Appendix <br />2015 <br />Reference <br />ROW), <br />(1) On south side of Westminster Ave <br />(3) On east side of Santa Ana <br />in the PE ROW, <br />Ricer (outside of PE ROW), <br />(2) Atthe Maintenance and Storage <br />(4) At Pacific Ace.; <br />Facility (MSF) site; <br />(5) In a parking structure at 5 1 <br />(3) On north side of Santa Am Blvd <br />and Main, and <br />east of Parton St.; and <br />(6) On south side of Santa Ana <br />(4) On north side of Santa Ana Bled <br />Bled at Garfield St. <br />and N. Garfield St. <br />Locations 1 and 2 are within the ROW <br />previously cleared. Locations 3 and 4 are <br />identified within the updated APE. <br />Appendix P to the EIR, the Drainage <br />Modification of scope of drainage <br />Appendix A <br />Technical Report, indicate storm drain <br />improvements to rely less on connections to <br />improvements on many streets outside <br />storm drain network and use surface <br />the project alignment. <br />conveyance in streets to maintain existing <br />drainage patterns to the maximum extent <br />practicable while addressing surface storm <br />water drainage needs generated by the <br />Project or change in drainage patterns <br />caused solely bythe Project. <br />Single contact wire in the PE ROW. <br />Two -wire catenary in the PE ROW. <br />No provision for underground fiber <br />Underground fiber optics cable <br />Appendix A <br />optics cable <br />(communications) from SARTC to OCTA <br />Garden Grove Bus Annex north of PE <br />ROW, approximately 1500 feet west of <br />Harbor Blvd. <br />July 8, 2016 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.