My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-046 - Approving Addendum Nos. 1 and 2
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2017
>
2017-046 - Approving Addendum Nos. 1 and 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2017 3:00:08 PM
Creation date
7/11/2017 9:25:32 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2017-046
Date
7/5/2017
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
809
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Santa Ana/Garden Grove Fixed Guideway Project Addendum <br />Construction and operation of the Project (the adopted Locally Preferred Alternative, or "LPA") was approved by the <br />Federal Transit Administration (FTA) in a Finding of No Significant Impact (FONSI), dated March 10, 2015 based on <br />the findings of the Revised Environmental Assessment (EA) (January 2015), pursuant to the National Environmental <br />Policy Act (NEPA). The City of Santa Ana certified the EIR (State Clearinghouse #2010051060) in January 2015, <br />which was subsequently adopted by OCTA. OCTA is a CEQA "Responsible Agency' as defined by CEQA Guideline <br />15381. Pursuant to CEQA Guideline 15381, "Responsible Agency" means "a public agency which proposes to carry <br />out or approve a project, for which a Lead Agency is preparing or has prepared an EIR or Negative Declaration." <br />The approved Project was based on a conceptual level of engineering. Subsequent to Project approval in 2015, <br />OCTA has taken the lead in advancing the design and implementation of the Project. As part of this engineering <br />design phase, OCTA is proposing some modifications to the Project as it was defined and analyzed in the EIR. The <br />modifications comprise of physical and operational improvements, and are partly derived from value engineering and <br />risk workshops conducted in 2015, as well as design coordination with OCTA's partner cities and stakeholders. The <br />modifications are not anticipated to result in changes to the maintenance plan for the Project. <br />3. DESCRIPTION OF DESIGN MODIFICATIONS <br />The following describes the proposed modifications that are the basis of evaluation in this Addendum. Additionally, <br />Table 3.1 provides a listing of design updates, comparing the description of Project features in the EIR to the revised <br />description of Project features resulting from the modifications. <br />The corresponding figures for each modification are referenced on the table and attached to this Addendum. Figure <br />1 provides an overview of the current Project features. Figures 2 to 12 provide graphics focused on specific changes <br />in Project features for added clarity. <br />2 I age 1170726.1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.