My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
22A - AWARD FODDRILL CONSTRUCTION
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2017
>
08/01/2017
>
22A - AWARD FODDRILL CONSTRUCTION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2017 9:37:05 AM
Creation date
7/27/2017 4:54:17 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Finance & Management Services
Item #
22A
Date
8/1/2017
Destruction Year
2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contract Award to Install LED Lighting Fixtures and Agreement for On -Bill Financing Loans <br />August 1, 2017 <br />Page 2 <br />'Actual incentive payments will be made based on verified and actual savings amounts and On -Bill <br />Financing will be based on review and approval of the City's Energy Efficiency Project Installation Report <br />Total project cost is $105,234.96, which includes a 10% contingency. Payback period is <br />estimated at 73 months for the Civic Center parking garage and 94 months for the Stadium. As <br />tabulated above, the amount of incentives and maximum on -bill financing approved by SCE <br />($107,079.71) exceeds the amount needed to fully fund the two projects. An innovative feature <br />of the recommended actions is the City will have no upfront costs as the awarded contractor will <br />finance the cost of the project. SCE will then pay contractor directly with the cash incentives and <br />OBF loan proceeds that SCE has approved for the project. <br />As a result of the OBF loan, the Civic Center's and Stadium's new electricity bill a lower amount <br />based on the energy reduction from the project, a new separate line -item will show the OBF loan <br />repayment amount. This amount will reflect kWh saved from the project multiplied by the <br />relevant billing rate. Once the OBF loan is paid in full, SCE will discontinue the OBF loan <br />repayment line -item, and the reduced energy usage due to the project should result in smaller <br />bills. (SCE cash incentives are grants and not repaid) <br />Staff requests the City Council approve the foregoing project and funding process. SCE Notices <br />of Approval for incentives totaling $15,001.88 and a maximum total OBF loan amount of <br />$92,077.83 and the loan agreement form are attached. Final actual loan amount will be <br />determined at project completion. <br />The Notice soliciting bids was advertised on March 31, 2017 on the City's online bid <br />management and publication system. A summary of the bids received is as follows: <br />Bids were received on <br />received from Foddrill <br />requirements. <br />25 Vendors were notified <br />3 Santa Ana vendor notified <br />28 Vendors downloaded the solicitation <br />5 Bids received <br />May 2, 2017 and were opened and evaluated (Exhibit 1). The bid <br />Construction is responsive to the specifications and meets the City's <br />22A-2 <br />MI <br />Civic Center ParkingGarage <br />38,452.20 38,452.20 <br />$7,458.96 <br />$8,792.23 <br />$45,319.07 <br />73 Months <br />353-16-0500868635 <br />Stadium <br />353-16-0500868641 <br />27,710.00 <br />$6,002.04 <br />$6,209.65 <br />$46,758.76 <br />94 Months <br />'Actual incentive payments will be made based on verified and actual savings amounts and On -Bill <br />Financing will be based on review and approval of the City's Energy Efficiency Project Installation Report <br />Total project cost is $105,234.96, which includes a 10% contingency. Payback period is <br />estimated at 73 months for the Civic Center parking garage and 94 months for the Stadium. As <br />tabulated above, the amount of incentives and maximum on -bill financing approved by SCE <br />($107,079.71) exceeds the amount needed to fully fund the two projects. An innovative feature <br />of the recommended actions is the City will have no upfront costs as the awarded contractor will <br />finance the cost of the project. SCE will then pay contractor directly with the cash incentives and <br />OBF loan proceeds that SCE has approved for the project. <br />As a result of the OBF loan, the Civic Center's and Stadium's new electricity bill a lower amount <br />based on the energy reduction from the project, a new separate line -item will show the OBF loan <br />repayment amount. This amount will reflect kWh saved from the project multiplied by the <br />relevant billing rate. Once the OBF loan is paid in full, SCE will discontinue the OBF loan <br />repayment line -item, and the reduced energy usage due to the project should result in smaller <br />bills. (SCE cash incentives are grants and not repaid) <br />Staff requests the City Council approve the foregoing project and funding process. SCE Notices <br />of Approval for incentives totaling $15,001.88 and a maximum total OBF loan amount of <br />$92,077.83 and the loan agreement form are attached. Final actual loan amount will be <br />determined at project completion. <br />The Notice soliciting bids was advertised on March 31, 2017 on the City's online bid <br />management and publication system. A summary of the bids received is as follows: <br />Bids were received on <br />received from Foddrill <br />requirements. <br />25 Vendors were notified <br />3 Santa Ana vendor notified <br />28 Vendors downloaded the solicitation <br />5 Bids received <br />May 2, 2017 and were opened and evaluated (Exhibit 1). The bid <br />Construction is responsive to the specifications and meets the City's <br />22A-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.