My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23A - AGMT KIMLEY - HORN
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2017
>
08/01/2017
>
23A - AGMT KIMLEY - HORN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2017 9:37:32 AM
Creation date
7/27/2017 4:54:18 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23A
Date
8/1/2017
Destruction Year
2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposal for <br />Santa Ana lain Street <br />Corridor Improvements <br />limited to north and south focus areas. Modifications to existing utilities and storm drains are not anticipated <br />for this project. <br />Deliverables: 30%, 60%, 95%, and 100% Plans, electronic fifes in Microstation V81 and PDF (final plans <br />will be seated and signed), and responses to previous review comments from the City <br />Task 10: ,Striping, ,Signing, and Parking Meter Plans <br />We will prepare striping and signing plans at a scale of 1" = 40' for the proposed improvements within the <br />limits of the project. Striping and signing plans will comply with the City of Santa Ana's standards, Caltrans, <br />and the California Manual on Uniform Traffic Control Devices. Flashing beacon installation and parking <br />meter details, if required, will be shown on the striping and signing plans. <br />Deliverables: 60%, 95%, and 100% Plans; electronic files in Microstation V81 and PDF (final plans will be <br />sealed and signed); and responses to previous review comments from the City <br />Task 11: Landscape and Irrigation Plans <br />Kimley-Horn will prepare landscape and irrigation plans for proposed plazas, on street parks, and bulb - <br />cuts within the project limits. These plans will be consistent with the City's Standards and General Plan; <br />the City's Scenic Corridor Elements; the City's Urban Design Elements; and California's Water Efficient <br />Landscape Ordinance. The plans will consider City maintenance when developing the design. <br />Deliverables: 60%, 959o; and 100% Plans; electronic files in Microstation V81 and PDF (final plans will be <br />sealed and signed); and responses to previous review comments from the City <br />Task 12: Street Amenities, Cultural Trail and Gateway Elements Plans <br />Our team will develop design concept plans based on the City's approved Vision Plan, establishing a visual <br />language for a cultural trail to obtain the City's concurrence on street amenities and gateway elements. We <br />will prepare a set of plans for street furnishings, based on the approved concept design drawings. Street <br />furnishings will include enhanced paving, seating, bike racks, trash receptacles, and a gateway element. It <br />will include the first phase implementation of the cultural trail, which will have approximately four markers. <br />The gateway element will be developed for installation at two locations. <br />Deliverables: 30%, 60%, 95%, and 100% Plans; electronic flies in Microstation V81 and PDF; and <br />responses to previous review comments from the City <br />Task 13: Open ,Space Plazas and Street Park Plans <br />We will refine the elements of the approved Vision Plan and develop a more detailed approach to the street <br />closures, parklets, and plazas. Developed concepts at the 30% stage will be reviewed with the City staff to <br />confirm concurrence with the project's objectives. Based on the approved design concepts, our team will <br />produce construction documents for the two -proposed plazalparldet areas as shown in the Vision Plan. <br />The plans will indicate hardscape, planted areas, and seating. It is assumed that the play equipment will be <br />specified by the City. <br />Deliverables; 30%, 60%, 95%, and 900% Plans; electronic tiles in Microstation V81 and PDF; and <br />responses to previous review comments from the City <br />Task 14: Street Light Plans <br />Kimley-Horn will prepare street light plans from First Street to St. Andrew Place. These plans will <br />incorporate pedestrian lighting along both sides of the street. We assume the current staggered street <br />lights will remain in place and are sufficiently lighting the roadway and sidewalk. The pedestrian lights are <br />City nrsnntnAna iiRRD77ao4.n 15 Kimlep orn <br />23A-17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.