My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
65A - SA JAIL REUSE STUDY
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2017
>
08/01/2017
>
65A - SA JAIL REUSE STUDY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2017 9:41:01 AM
Creation date
7/27/2017 4:54:20 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
City Manager's Office
Item #
65A
Date
8/1/2017
Destruction Year
2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Chart below represents a summary depicting the rating of each functional use area contained in the <br />facility. The numbers 1 - 14 represent the functional use areas as follows: (1) Administration, (2) Lobby/ <br />Public, (3) Visitation, (4) Central Control, (5) Main / Storage / Utility (6) Food Service, (7) Laundry, (8) <br />Intake / Release, (9) Medical / Mental Health / Dental, (10) Inmate Programs, (11) Housing / Dayrooms, <br />(12) Circulation, (13) Quasi -Outdoor Recreation Yards, and (14) Vehicle Sallyport. <br />Building <br />Building <br />Space I <br />System <br />Santa Ana City Jail <br />Condition Quality Evaluation Ratings <br />Evaluation Ratings/Functional use Area <br />Systems/ Elements <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />10 <br />11 <br />12 <br />13 <br />14 <br />AVG <br />Space <br />1.8 <br />3.0 <br />2.5 <br />1,8 <br />3.0 <br />1.8 <br />3.0 <br />2.8 <br />1.8 <br />3.0 <br />1.8 <br />3.0 <br />2.3 <br />HVAC <br />2.8 <br />2,8 <br />2.8 <br />2,8 <br />2.8 <br />2.8 <br />2,8 <br />2.8 <br />2.8 <br />2,8 <br />2.8 <br />2.8 <br />2.8 <br />Plumbing <br />1.5 <br />1.5 <br />1.5 <br />1.5 <br />1.5 <br />1.5 <br />1.5 <br />1.5 <br />1.5 <br />1.5 <br />1.5 <br />1.5 <br />L5 <br />Elect/Lighting <br />2.8 <br />2.8 <br />2.8 <br />2.8 <br />2.8 <br />2.8 <br />2.8 <br />J2.33.0 <br />2.8 <br />2.8 <br />2.8 <br />2.8 <br />2.8 <br />2.8 <br />Noise Control <br />3.0 <br />2.8 <br />2.8 <br />3.0 <br />2.5 <br />2.5 <br />2.3 <br />30 <br />28 <br />2.5 <br />30 <br />3.0 <br />2.7 <br />Fire Safety <br />2.8 <br />2.8 <br />2.8 <br />2.8 <br />2.8 <br />2.8 <br />2.8 <br />2.8 <br />2.8 <br />2.8 <br />2.8 <br />2.8 <br />2.8 <br />HandicappedlADA <br />30 <br />3.0 <br />2.8 <br />1.8 <br />1.8 <br />20 <br />1.8 <br />2.5 <br />28 <br />3.0 <br />2.8 <br />3.0 <br />2.5 <br />Structures <br />3.0 <br />3.0 <br />3.0 <br />3.0 <br />3.0 <br />30 <br />3.0 <br />0 <br />3.0 <br />3.0 <br />2.8 <br />3.0 <br />3.0 <br />3.0 <br />Security3.0 <br />3.030 <br />3.0 <br />3.0 <br />3.0 <br />3.0 <br />0 <br />3.0 <br />2.3 <br />3.0 <br />3.0 <br />3.0 <br />2.9 <br />Total <br />23.5 <br />24.5 <br />23.8 <br />22.3 <br />1 23.0 <br />22.0 <br />22.8 <br />23.8 <br />1 22.3 <br />24.0 <br />1 22.3 <br />1 24.0 <br />23.3 <br />24.8 <br />23.3 <br />Summary Space/ <br />Systems Rating <br />2.6 <br />2.7 <br />2.5 <br />2.5 <br />2.6 <br />2.4 <br />2.5 <br />2.6 <br />2.5 <br />2.7 <br />2.5 <br />2.7 <br />2.6 <br />2.8 <br />2.6 <br />Building/ System Rating Scale: 0- Extremely Inadequate, 1- Inadequate; 2- Adequate; 3- Extremely Adequate. <br />From the evaluation assessment of the space and building systems associated with the Santa Ana Jail, <br />the overall score is 2.6 which is very adequate for a California detention facility. <br />Assessments of the current condition of the primary building elements and systems which support the <br />Santa Ana Jail were also made. Judgments about these systems considered a number of factors <br />involving the quality of materials, reoccurring failures, inoperability, the ease or difficulty in getting parts or <br />service, and how quickly a repair or upgrade may have been made. The building systems which were <br />examined included (a) HVAC, (b) plumbing, (c) lighting, (d) noise control systems, (e) fire and life safety, <br />(I) security, (g) handicapped access, and (h) structure. The results of the assessment revealed the <br />following building system strengths and deficiencies: <br />Building System Strengths: <br />Building Structure <br />■ The building is predominately of concrete wall construction which shows no signs of <br />structural failure or wear requiring maintenance or upkeep. High quality finishes such <br />as granite, porcelain fixtures, wood doors, and flooring throughout the facility make it <br />one of the most attractive detention facilities in the state. All the ceilings in secure <br />areas are very substantial heavy perforated steel mesh. <br />Security Locks <br />■ Locking devices throughout the facility appear to be serviceable and suitable for their <br />intended function. Sliders ran well and appeared to be very well maintained. Manual <br />locking devices appeared to function as intended and were well maintained. <br />HVAC <br />■ The HVAC unit which was inspected is manufactured by York and original to the <br />building. It is equipped with manual smoke evacuation in the housing units. The <br />system appears to operate normally. Forty to forty-five HVAC units were replaced <br />with VFD models two to three years ago with only a few left to be replaced. <br />65A-11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.