Laserfiche WebLink
Grand Avenue Widening Project Environmental Impact Report Section 8.0 <br />8.3 IMPACTS OF THE NO PROJECT ALTERNATIVE RELATED TO POPULATION <br />AND HOUSING <br />The No Project Alternative does not include any widening of the project segment of Grand Avenue. <br />Therefore, this Alternative will not result in the acquisition of any residential units on this segment <br />of Grand Avenue or in the displacement of any residents. No mitigation is required. <br />8.4 IMPACTS OF THE NO PROJECT ALTERNATIVE RELATED TO AIR QUALITY <br />The No Project Alternative would not include any construction on Grand Avenue and, therefore, <br />would not result in short term, construction related air emissions. No mitigation is required. <br />As shown earlier on Table 3.4-2, existing carbon monoxide (CO) concentrations in the Grand <br />Avenue area do not exceed the one and eight hour standards. In 2020, the No Project Alternative <br />will result in increased CO levels, with the eight hour concentration at the intersection of Grand <br />Avenue and Fruit Street approaching, but not exceeding, the standard. CO concentrations under the <br />No Project Alternative would be greater at all three intersections for both the one and eight hour <br />periods, compared to the with project conditions. <br />The SCAG air quality policies, from the Regional Comprehensive Plan and Guide, were shown <br />earlier in Table 3.4-4. The No Project Alternative was evaluated for consistency with each of these <br />policies. As shown in Table 3.44, the No Project Alternative is consistent with policy 5.11. Policy <br />5.07 was determined not to apply to the No Project Alternative.. Therefore, the No Project <br />Alternative will not result in adverse impacts related to SCAG air quality policies. No mitigation is <br />required. <br />8.5 IMPACTS OF THE NO PROJECT ALTERNATIVE RELATED TO <br />TRANSPORTATION <br />As shown earlier in Table 3.5-6, the No Project Alternative will result in levels of service E or F in <br />the PM peak hour in 2020 at the following intersections on Grand Avenue: <br />Seventeenth Street <br />I-5 northbound ramps <br />Fourth Street <br />There is no on street parking on the project segment of Grand Avenue. Therefore, the No Project <br />Alternative will not result in impacts related to on street parking. No mitigation is required. <br />The SCAG transportation policies, from the Regional Comprehensive Plan and Guide, were shown <br />earlier in Table 3.5-7. The No Project Alternative was evaluated for consistency with each of these <br />policies. As shown in Table 3.5-7, the No Project Alternative is consistent with each policy, except <br />for policy 4.60 and certain policies determined not to apply to the No Project Alternative. Policy <br />4.60 is related to the projects that reduce dependency on single occupant vehicle travel. Because the <br />No Project Alternative is not consistent with the City's General Plan, which is the City's plan for <br />implementing transportation and land policies in the City, it is not consistent with this SCAG policy. <br />FIPROJ-ENMGrand eirWew Text - Gran&Section 8.0-new.doc Page 8-2 <br />