Laserfiche WebLink
Grand Avenue Widening Project Environmental Impact Report Section 8.0 <br />Mitigation to avoid this impact is the implementation of a widening alternative consistent with the <br />Circulation Element. <br />8.6 IMPACTS OF THE NO PROJECT ALTERNATIVE RELATED TO NOISE <br />The No Project Alternative includes no construction on the project segment of Grand Avenue. <br />Therefore, the No Project Alternative will not result in short term noise impacts. No mitigation is <br />required. <br />The No Project Alternative would result in increased noise exposure along the project segment of <br />Grand Avenue in 2020, compared to existing conditions, as shown in Table 8-1 which compares the <br />distances to the Community Noise Equivalent Level (CNEL) contours for existing conditions, the <br />2020 No Project Conditions and the 2020 with project conditions. The noise exposure under the No <br />Project Alternative would be the same as under the with project conditions in 2020, as shown in <br />Table 8-1. This level of increase would be perceptible to many listeners and would, therefore, be <br />considered a significant adverse impact of the No Project Alternative. <br />8.7 IMPACTS OF THE NO PROJECT ALTERNATIVE RELATED TO CULTURAL <br />RESOURCES <br />The No Project Alternative will require no construction and will not result in an adverse impacts on <br />cultural resources. No mitigation is required. <br />8.8 IMPACTS OF THE NO PROJECT ALTERNATIVE RELATED TO OTHER <br />ENVIRONMENTAL PARAMETERS <br />As described earlier, the IS Checklist, included in Appendix A of this Environmental Impact Report <br />(EIR), indicated that the proposed Grand Avenue widening was determined to not result in a <br />significant adverse impact or to result in an adverse impact which would be mitigated to below a <br />level of significance for a number of environmental parameters. These parameters were evaluated <br />for the No Project Alternative, to determine if the No Project Alternative could result in significant <br />adverse impacts related to these parameters. <br />Water: The No Project Alternative will not result in adverse impacts related to changes in <br />absorption, drainage patterns or the rate and amount of surface runoff; the exposure of <br />people or property to flooding; the quality and quantity of surface waters; changes to river or <br />stream channels or currents; changes to surface water bodies; changes in the flow or <br />direction of groundwater, the quality and quantity of groundwater, or groundwater recharge; <br />or the use of groundwater supplies for public water uses. No mitigation is required. <br />Air Quali : The No Project Alternative will not result in adverse impacts related to the <br />alteration of air movements, moisture, climate or temperature in the area; and the creation of <br />objectionable odors. No mitigation is required. <br />F: IPROJ-ENMGrand eirWew Text- Gran&Section 8.0-new.doc Page 8-3 <br />