Laserfiche WebLink
WINDOW BOARDING SPECIFICATION <br />WINDOW - OUTSIDE VIEW <br />NOTES: <br />ill" CDR PLYWOOD <br />CUT TO TO COVER <br />WINDOW OPENING <br />I <br />SECURE TO STRUCTURE <br />WITH <br />GALVANIZED NAILS <br />\ 9� <br />r <br />2X4BRACE <br />CUT TO OUTSIDE <br />DIMENSION OF <br />WINDOW TRIM <br />i <br />2 X4 BRACE <br />CUT TO SIZE OF <br />PLYWOOD <br />J� <br />Y <br />M'CARRIAGE BOLT - <br />12'LONGICOURSE THREAD <br />NUT TO MATCH, WASHERS INSTALLED <br />ON BOTH SIDES <br />ROUNDED HEAD OF BOLT ON OUTSIDE <br />1. FOR DOUBLE HUNG WINDOWS, SLIDE SASH TO CENTER OF UNIT AND PASS BOLTS <br />THROUGH OPENINGS AT TOP AND BOTTOM. <br />2. STORM WINDOWS SHOULD BE REMOVED AND STORIED INSIDE STRUCTURE. <br />3. OUTSIDE TRIM MAY HAVE TO BE REMOVED TO ACCOMMODATE A FLUSH AND <br />TIGHT FIT. <br />4. TIGHTEN NUTS FROM INSIDE, ENOUGH TO SLIGHTLY COMPRESS 2X4 BRACE. <br />5, BRACE LOCATIONS: A = 1/3 B (SEE DIMENSION LOCATIONS ON DRAWING) <br />NOTE: WINDOWS 3 FEET IN HEIGIIT OR SHORTER ONLY REQUIRE ONE <br />BRACE. <br />6. LOCATION OF BOLT HOLES: C = 1/31) (SEE DIMENSION LOCATIONS ON DRAWING) <br />7. THE PLYWOOD BOARD SHOULD BE SECURED WITH SCREWS EVERY 12" ALONG <br />THE PERIMETER OF THE FRAME OF THE WINDOW, DOOR, OR OPENING, AND WITH <br />DECD NAILS AT EVERY 6" MARK WHERE SCREW IS NOT PLACED. <br />City of Santa Ana RFP 17-066 <br />Page Al -4 <br />25G-15 <br />9 <br />k <br />k <br />4 � <br />E <br />tln m n. w en mn ca rz x� t,v <br />vs a' m k <br />k <br />k <br />i <br />1 <br />4 <br />k <br />4 <br />6 <br />1 <br />tl <br />1 <br />s <br />1 <br />i <br />B <br />6 <br />i <br />8 <br />5 <br />k <br />k <br />6 <br />k <br />i <br />m - - m - m m ® e. <br />- co m � <br />k <br />S <br />1� <br />! <br />i <br />WINDOW - OUTSIDE VIEW <br />NOTES: <br />ill" CDR PLYWOOD <br />CUT TO TO COVER <br />WINDOW OPENING <br />I <br />SECURE TO STRUCTURE <br />WITH <br />GALVANIZED NAILS <br />\ 9� <br />r <br />2X4BRACE <br />CUT TO OUTSIDE <br />DIMENSION OF <br />WINDOW TRIM <br />i <br />2 X4 BRACE <br />CUT TO SIZE OF <br />PLYWOOD <br />J� <br />Y <br />M'CARRIAGE BOLT - <br />12'LONGICOURSE THREAD <br />NUT TO MATCH, WASHERS INSTALLED <br />ON BOTH SIDES <br />ROUNDED HEAD OF BOLT ON OUTSIDE <br />1. FOR DOUBLE HUNG WINDOWS, SLIDE SASH TO CENTER OF UNIT AND PASS BOLTS <br />THROUGH OPENINGS AT TOP AND BOTTOM. <br />2. STORM WINDOWS SHOULD BE REMOVED AND STORIED INSIDE STRUCTURE. <br />3. OUTSIDE TRIM MAY HAVE TO BE REMOVED TO ACCOMMODATE A FLUSH AND <br />TIGHT FIT. <br />4. TIGHTEN NUTS FROM INSIDE, ENOUGH TO SLIGHTLY COMPRESS 2X4 BRACE. <br />5, BRACE LOCATIONS: A = 1/3 B (SEE DIMENSION LOCATIONS ON DRAWING) <br />NOTE: WINDOWS 3 FEET IN HEIGIIT OR SHORTER ONLY REQUIRE ONE <br />BRACE. <br />6. LOCATION OF BOLT HOLES: C = 1/31) (SEE DIMENSION LOCATIONS ON DRAWING) <br />7. THE PLYWOOD BOARD SHOULD BE SECURED WITH SCREWS EVERY 12" ALONG <br />THE PERIMETER OF THE FRAME OF THE WINDOW, DOOR, OR OPENING, AND WITH <br />DECD NAILS AT EVERY 6" MARK WHERE SCREW IS NOT PLACED. <br />City of Santa Ana RFP 17-066 <br />Page Al -4 <br />25G-15 <br />