My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25J - AGMT - SEWER SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2017
>
08/15/2017
>
25J - AGMT - SEWER SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2017 6:45:13 PM
Creation date
8/10/2017 6:38:12 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25J
Date
8/15/2017
Destruction Year
2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCOPE OF SERVICES <br />12. If a grade 5 condition is found, the camera operator will contract the City's project manager with <br />the Manhole(s) number and iWater I.D. <br />13. If any discrepancies are found on the City maps or infraMap software, H & H operator will promptly <br />notify the City's project manager. <br />14. Upon completion of each run, the manhole cover is replaced, traffic control items are retrieved <br />and the truck moves on to the next manhole, using steps 4 —14. <br />15. At the end of the working day, or as requested by the City, we will synchronize the data collected <br />from the City provided PC tablet to the City computer in the city yard. <br />16. As required, all traffic control will be done by Houston & Harris per the W.A.T.C,H. manual. <br />Residential streets will be done using standard traffic control. Low traffic volume on arterial streets <br />will be done during daytime off peak traffic hours. High traffic volume on arterial streets will be <br />done at night. The City's project manager will be informed whenever night time work is scheduled. <br />17. At the end of each City assigned task, Houston & Harris will submit a hard drive with all the video <br />and WinCan data base with PDF files and Jpegs. The operator will use the tablet with infraMAP <br />supplied by the city to record the location. <br />Sewer Manhole Inspections <br />The manhole inspection will be completed as per the above Sewer Mainline Video Inspection procedure <br />with the following exceptions: <br />1. All manhole inspection will be done in MACP level 1 format. <br />2. Any defect will be detailed using MACP coding. <br />3. A minimum of 3 digital pictures will be provided looking down the manhole. <br />4. A measurement from the top of the manhole to the bottom of the sewer channel will be included in <br />the report. The measurement will be done in inches. <br />5. At the completion of a section or task of manhole inspections, a hard drive will be provided to the <br />City. <br />Sewer Lateral Inspections <br />The lateral inspections will be completed as per the above Sewer Mainline Video Inspection procedure <br />with the following exceptions: <br />1. All sewer lateral inspections will be done using LACP format. <br />City of Santa Ana <br />Closed Circuit Television (CCN) Inspection of Sanitary Sewers ................ <br />RFP NO.: 17.055 -- -. <br />21831 Barton Road <br />Grand Terrace, CA 92313 <br />'`''�` 989-022.89n-�7rm�.c�Iplry', r�1�p E <br />.. CA #884111 <br />
The URL can be used to link to this page
Your browser does not support the video tag.