My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25H - AGMT - AV EQUIPMENT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2017
>
08/15/2017
>
25H - AGMT - AV EQUIPMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2017 6:43:50 PM
Creation date
8/10/2017 6:38:34 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Parks, Recreation, & Community Services
Item #
25H
Date
8/15/2017
Destruction Year
2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Testimonials from others where value was provided <br />Project countdown till live date <br />Informal walking around to talk up the project to team members, <br />users and stakeholders <br />Celebrations to bring visibility to the completion of major milestones <br />Publicizing accomplishments <br />Step 1: Manage Risks <br />For every high and medium risk where the project manager is creating a risk <br />mitigation plan, a contingency plan shall be created to document the <br />consequences to the project if the risk plan fails and the risk actually occurs. For <br />instance, If the consequence of a potential risk Occurring is that the project will <br />need to be stopped; this should be a strong indication that the risk plan must be <br />aggressive and comprehensive to ensure that the risk is managed successfully. <br />Step 8: Manage Documents <br />A Document Repository shall be established for this project. All project documents <br />shall be orderly stored in a project folder including CAD diagrams, project notes, <br />correspondences, BFI's and internal and/or external change orders. <br />Step 9: Manage Quality <br />Digital Networks Group shall provide an internal set of metrics that will provide <br />insight into how the project is progressing, and how the deliverable creation <br />process is working. The project manager will be capturing overall financial and <br />duration metrics on a daily basis, These are the areas where quality is being/will <br />be managed by Digital Networks Group: <br />• Are actual work timelines in line with estimated deliverables? <br />• Is client satisfied with the project teams communication? <br />• What is the amount of rework required due to faulty up -front <br />analysis? <br />• Are there excessive resolution issues? <br />• Number of major errors uncovered during testing <br />• Capture project metrics on a daily basis. le. Labor hours, <br />freight, travel costs, etc, <br />Step 94: Manage Metrics <br />The following list provides metrics that Digital Networks Group tracks on all Major <br />Projects: <br />25H-21 <br />1GITAL NETWORKS <br />www.digitainetworksgroup.com '. <br />
The URL can be used to link to this page
Your browser does not support the video tag.