My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TETRA TECH, INC. - 2017
Clerk
>
Contracts / Agreements
>
T
>
TETRA TECH, INC. - 2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2020 12:51:49 PM
Creation date
8/15/2017 9:58:39 AM
Metadata
Fields
Template:
Contracts
Company Name
TETRA TECH, INC.
Contract #
A-2017-154
Agency
PUBLIC WORKS
Council Approval Date
6/20/2017
Expiration Date
6/20/2020
Insurance Exp Date
10/1/2020
Destruction Year
0
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
® TETRATECH <br />EXHIBITI; - SW <br />2017 <br />HOURLY CHARGE <br />RATE AND EXPENSE REIMBURSEMENT SCHEDULE <br />Project Management <br />Construction <br />Project Managed <br />:$195.00 <br />Construction Project Rep <br />$78.00 <br />Project Manager 2 <br />$220.00 <br />Construction Project Rep 2 <br />$85.00 <br />Sr Project Manager <br />$275.00 <br />Sr Constr Project Rep 1 <br />$100.00 <br />Program Manager <br />$297.00 <br />Sr Constr Project Rep 2 <br />$115.00 <br />Principal in Charge <br />$315.00 <br />Construction Managed <br />$165.00 <br />Construction Manager 2 <br />$185.00 <br />Engineers <br />Construction Director <br />$233.00 <br />Engineering Technician <br />$37.00 <br />Engineer 1 <br />$96.00 <br />General & Administrative <br />Engineer2 <br />$115.00 <br />Project Assistant <br />$67.00 <br />Engineer 3 <br />$125.00 <br />Project Assistant 2 <br />$75.00 <br />Project Engineer 1 <br />$140.00 <br />Project Administrator <br />$95.00 <br />Project Engineer 2 <br />$155.00 <br />Sr Project Administrator <br />$120:00 <br />Sr Engineer 1 <br />$170,00 <br />Sr. Graphic Artist <br />$150.00 <br />Sr Engineer 2 <br />$175,00 <br />Technical Writer 1 <br />$97.00 <br />Sr Engineer 3 <br />$210.00 <br />Technical Writer 2 <br />$124.00 <br />Principal Engineer <br />$300.00 <br />Sr Technical Writer <br />$155.00 <br />Planners <br />Information Technology <br />Planner 1 <br />$104,00 <br />Systems Analyst/Programmer 1 <br />$77.00 <br />Planner <br />$115.00 <br />Systems Analyst / Programmer 2 <br />$ 115.00 <br />Sr Planner 1 <br />$125.00 <br />Sr Sys Analyst / Programmer 1 <br />$130.00 <br />Sr Planner 2 <br />$151.00 <br />Sr Systems Analyst / Programmer 2 <br />$196.00 <br />Sr Planner 3 <br />$175.00 <br />Project Accounting <br />Designers & Technicians <br />Project. Analyst 1 <br />$90.00 <br />CAD Technician 1 <br />$65.00 <br />Project Analyst 2 <br />$114.00. <br />CAD Technician 2 <br />$75.00 <br />Sr Project Analyst <br />$155.00 <br />CAD Technician 3 <br />$90.00 <br />CAD Designer <br />$100.00 <br />Reimbursable In -House Costs: <br />Sr CAD Designer 1 <br />$125.00 <br />Photo Copies (B&W 8.5"xl I") <br />$ 0.15/Each <br />Sr CAD Designer 2 <br />$145.00 <br />Photo Copies (B&W 11"xl7") <br />$ 0.40/Pach <br />CAD Director <br />$15000 <br />Color Copies (up to 8.5"xl l") <br />$ 2.00/Lach <br />Survey Tech 1 <br />$50.00 <br />Color Copies (to 11 "x17") <br />$ 3.00/Each <br />Compact Discs <br />$10/each <br />Health & Safety <br />Large format copies <br />$0.40 S.P. <br />I'I&S Administrator <br />$95.00 <br />Computer Usage: not to exceed $3.55/hour <br />SrII&S Administrator <br />$115.00 <br />Mileage -Company Vehicle <br />$0.80/mule <br />H&SManager <br />$145.00 <br />Mileage-POV <br />$0.55/mile* <br />*current GSA POV mileage rate subject to change <br />All other direct costs, such as production, special photography, postage, delivery services, overnight mail, <br />printing and any other services performed by subcontractor will be billed at cost plus. 10%o. <br />NOTE: Rates subject to change annually. <br />
The URL can be used to link to this page
Your browser does not support the video tag.