My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23A - PROJ - 17 ST WATER MAIN
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2017
>
09/05/2017
>
23A - PROJ - 17 ST WATER MAIN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2017 5:01:18 PM
Creation date
8/31/2017 4:45:04 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23A
Date
9/5/2017
Destruction Year
2022
Document Relationships
AMPCO CONTRACTING, INC.
(Message)
Path:
\Contracts / Agreements\ PROJECTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REQUEST FOR <br />COUNCIL ACTION <br />CITY COUNCIL MEETING DATE: <br />SEPTEMBER 5, 2017 <br />TITLE: <br />AWARD CONTRACT FOR 17TH STREET <br />WATER MAIN IMPROVEMENTS — PHASE 2; <br />(PROJECT 166468) <br />(STRATEGIC PLAN NO. 6, 1C) <br />RECOMMENDED ACTION <br />CLERK OF COUNCIL USE ONLY: <br />APPROVED <br />❑ As Recommended <br />❑ As Amended <br />❑ Ordinance on 1"Reading <br />❑ Ordinance on 2nd Reading <br />❑ Implementing Resolution <br />❑ Set Public Hearing For <br />CONTINUED TO <br />FILE NUMBER <br />Authorize the City Manager and Clerk of the Council to award and execute a construction contract to <br />AMPCO Contracting, Inc., the lowest responsible bidder, in accordance with the bid in the amount of <br />$1,129,000, for the term beginning upon execution of the contract and ending upon project <br />completion, for the construction of the 17th Street Water Main Improvements — Phase 2 Project, <br />subject to nonsubstantive changes approved by the City Manager and City Attorney. <br />2. Approve the Project Cost Analysis for a total estimated project delivery cost of $1,411,250, which <br />includes the contract base amount, administration, inspection, testing, and a $112,900 contingency. <br />DISCUSSION <br />The existing 10 -inch diameter cast iron water main located on 17th Street between Bristol Street and <br />Flower Street (Exhibit 1) was installed in the 1950s and has been experiencing a number of significant <br />breaks and leaks. Staff monitors the condition of water main pipelines by assessing critical factors such as <br />history of breaks, size, location, and system redundancy to determine the replacement priorities. The <br />improvements for this priority location include the construction of a new 8" & 12" polyvinyl chloride water <br />main, fire hydrants, water services, and appurtenances. Once this project is completed, water service <br />reliability and quality of service will improve significantly. In addition, water main breaks and the possibility <br />of a loss of service will be substantially reduced. <br />The Notice Inviting Bids was advertised on June 2 and June 5, 2017, and bids were opened on June 29, <br />2017. The following is a summary of the bid invitations mailed and received, and the bid results: <br />Contractor Participation Data <br />Santa Ana contractors receiving notices <br />12 <br />Contractors requesting bidding documents <br />17 <br />Bids received <br />7 <br />Bids received from Santa Ana contractors <br />0 <br />23A-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.