My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23A - PROJ - 17 ST WATER MAIN
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2017
>
09/05/2017
>
23A - PROJ - 17 ST WATER MAIN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2017 5:01:18 PM
Creation date
8/31/2017 4:45:04 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23A
Date
9/5/2017
Destruction Year
2022
Document Relationships
AMPCO CONTRACTING, INC.
(Message)
Path:
\Contracts / Agreements\ PROJECTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO,: 16-6468 <br />SEVENTEENTH STREET WATER MAIN IMPROVEMENTS PHASE 2 <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />.Amount <br />*15 <br />8" Resilient Wedge Gate Valve <br />2 <br />EA <br />$ <br />$ <br />2,000.00 <br />4,000.00 <br />116 <br />12 "Resilient Wedge Gate Valve, City <br />2 <br />EA <br />$ 1 <br />$ <br />Supplied <br />1,500.00 <br />3,000.00 <br />*17 <br />12" Resilient Wedge Gate Valve <br />5 <br />EA <br />$ <br />$ <br />4,000.00 <br />20,000.00 <br />18 <br />Bore and Sack, Install Steel Casing and <br />2 <br />EA <br />$ <br />$ <br />P.V.C. Carrier Pipe <br />sub price <br />60,000.00 <br />19 <br />Concrete Bus Pad <br />2 <br />EA <br />$ <br />$ <br />20,000.00 <br />40,000.00 <br />20 <br />Traffic Loap Detector <br />6 <br />EA <br />$ <br />$ <br />1,000.00 <br />6,000.00 <br />21 <br />Striping, and Pavement ivlarkings <br />I <br />LS <br />$ <br />$ <br />10,000.00 <br />10,000.00 <br />22 <br />Traffic Control and Traffic Control Plan <br />1 <br />LS <br />$ <br />$ <br />7,000.00 <br />7,000.00 <br />*23 <br />Vertical Offset (As Needed) <br />3 <br />EA <br />$$ <br />8,000.00 <br />24,000.00 <br />*24 <br />Potholing (As Needed) <br />25 <br />EA <br />$ <br />$ <br />1,000.00 <br />25,000.00 <br />*25 <br />Imported Backfili Material (As Needed) <br />100 <br />CY <br />$ <br />$ <br />75.00 <br />7,500.00 <br />26 <br />CCTV Inspection of Existing Sewer Mains <br />3,000 <br />LF <br />$ <br />$ <br />2.00 <br />6,000.00 <br />21 <br />CCTV Inspection of Existing Sewer <br />60 <br />EA <br />$ <br />Laterals <br />50.00 <br />3,000.00 <br />28 <br />As-Builtz <br />1 <br />IS <br />$ <br />$ <br />2,000.00 <br />2,000.00 <br />P-2 of P-17 <br />23A-6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.