My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23A - PROJ - 17 ST WATER MAIN
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2017
>
09/05/2017
>
23A - PROJ - 17 ST WATER MAIN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2017 5:01:18 PM
Creation date
8/31/2017 4:45:04 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23A
Date
9/5/2017
Destruction Year
2022
Document Relationships
AMPCO CONTRACTING, INC.
(Message)
Path:
\Contracts / Agreements\ PROJECTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.: 16-6468 <br />SEVENTEENTH STREET WATER MAIN IMPROVEMENTS PHASE 2 <br />TOTAL BASE; BID ©D D . ,(-V <br />The lowest responsible bidder shall be selected based on the total base bid. The City reserves the <br />right to award the Base Bid, and any, all, or none of the add -alternate bid items (if any). <br />x The quantity for this bid item is shown for bid comparison only. This bid item shall not be <br />subject to the "25%" limit as stated in Section 3-2 of the Standard Specifications. The actual <br />amount for this item will be dictated by the actual quantity used, and the Agency reserves the <br />right to increase or decrease the quantity of this item accordingly. <br />TIME FOR COMPLETION OF IMPROVEMENTS AND LIQUIDATED DAMAGES <br />The undersigned bidder hereby proposes to complete the Work for the total base bid amount <br />shown above, within eighty (80) working days after the commencement date stated in the Notice <br />to Proceed. <br />• 15 Days for data gathering exploratory potholing <br />• 65 Project construction <br />The bidder also proposes to continence construction of the Work within fifteen (15) days after <br />issuance of a Notice to Proceed, and to continue in a diligent and workman -like manner without <br />interruption, and to complete the construction thereof within the time specified above. <br />The liquidated damages amount, in lieu of the amount specified in Subsection 6-9 of the <br />Standard Specifications, shall be S1,000 per calendar day. <br />Name of Firm AMPCO Contracting. Inc. <br />Signature of BIDDER <br />Reginald KawaIe ama IV- President <br />Title Matthew Mutton- Secretary <br />(If an individual, so state. If a firm or co -partnership, state the firm name and give the names of <br />all individual co-partners composing the firm. If a corporation, state legal name of corporation, <br />and names of President, Secretary, Treasurer and Manager, thereof.) <br />P-3 of P-17 <br />23A-7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.