My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25I - AGMT - WALNUT PUMP STATION
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2017
>
09/19/2017
>
25I - AGMT - WALNUT PUMP STATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2017 5:53:57 PM
Creation date
9/15/2017 1:05:03 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25I
Date
9/19/2017
Destruction Year
2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
13. Evaluate the completion of the work of the contractor and make <br />recommendations to the City when work is ready for final inspection. Assist the <br />City in conducting final inspections. <br />14. Facilitate and coordinate inspection by representatives of other agencies. <br />15. Schedule and coordinate special inspection and material testing with the County <br />of Orange or other consultants. <br />City Responsibilities: <br />1. Provide a testing laboratory for special inspection and material testing and other <br />quality assurance program as required by the contract documents. <br />2. Process progress payments upon receipt of approved payment requests from the <br />resident engineer/inspector. <br />3. Furnish copies of construction documents, including plans and specifications. <br />4. Communicate with other consultant to review shop drawings and submittals, <br />respond to requests for information and revise plans if needed. <br />5. Provide a field office for the Project Manager and the Project Engineer. <br />Tee Proposal: <br />In addition to Section III.B.3 (Submittal Requirements: Fee Proposal) fee schedule shall be <br />structured as follows: <br />The cost proposal must include the projected staff hours, hourly rates, unit prices and <br />reimbursable expenses for the project, as follows: <br />[I] Itemized estimated breakdown for services for construction engineering services for the <br />duration of construction. <br />a. Personnel costs - Itemized to show the following: <br />1. Personnel by classification/responsibilities. <br />2. Hourly rate for each classification. <br />3. Estimated hours for each personnel category. <br />4. Subtotal cost for each category. <br />City of Santa Ana RFP 17-034 <br />
The URL can be used to link to this page
Your browser does not support the video tag.