My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25I - AGMT - WALNUT PUMP STATION
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2017
>
09/19/2017
>
25I - AGMT - WALNUT PUMP STATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2017 5:53:57 PM
Creation date
9/15/2017 1:05:03 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25I
Date
9/19/2017
Destruction Year
2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. Total estimated personnel cost. <br />The estimated construction duration stated above is for the purpose of cost estimate only. <br />The length of time requiring Consultant's services will be dependent on the construction <br />progress. For services under this category, the Consultant shall be paid according to hourly <br />rates set forth herewith and the actual hours of service. <br />b. Estimated reimbursable Expenses: <br />1. Costs of supplies and materials (itemized). <br />2. Travel - Transportation and per diem or subsistence listed separately, if any. <br />3. Any other direct charges. <br />4. Total estimated reimbursable expenses. <br />For services under this category, the Consultant shall be paid according to the rates set forth <br />herewith and the actual reimbursable expenses. <br />c. Subtotal of a and b. <br />[II] Contingency services for each month after the original construction contract time: <br />Services under this category will be provided when requested by the City, and the Consultant <br />shall be paid according to hourly rates set forth herewith and the actual hours of service. <br />For the purpose of comparison, each proposer shall use the same number of hours: 1,000 hours <br />for the Project Manager and the Project Engineer. The subtotal of this category shall be <br />calculated as follows: <br />Proposed <br />Hourly Rate Hours Total <br />Project Manager $ /Hr. 1,000 <br />Project Engineer $ /Hr. 1,000 <br />City of Santa Ana RFP 17-034 <br />� <br />g116 <br />