Laserfiche WebLink
a NVIBONNENTAL INPAO'r: ktI-0K V ANaaNnUN <br />, SRFTENRa R°2017 <br />ARMSTRONG YANOtr kaVIM PROPOT <br />SANTA ANM OALIYORNtA_ <br />2.2 AGRICULTURE AND FOREST <br />RESOURCES ncht�7e os�su�ilw <br />- tiiRviRwl 'Eev'erc CasNgefeom <br />Would the pmjeerr 6npvcM Inipael Pr¢vkuYMaljTa <br />S1ateividc Importance.(Fanaland) to non-agricultural use? (The <br />Farmland Jliipping:and Moohoring program Ili ilie California ❑ ❑ <br />Resource.: Agency, Department of consmution, maintains <br />detailed rna m of thescandbthercategories:oftnnniand). <br />(b) Conflict with existing zoning foragricultutalasenraWilliamson ❑ ❑ ,® <br />Act contract? <br />(c) Involve other changes in the existing environmeiu which, due to <br />their loeatioe:otifilure, cow ldtndMduallgorcumulatively result ❑ ❑ -® <br />in loss of Farmland, to non-agricultural use? <br />Analysis of Project.Changes: <br />a) At the firne of eciii(icalion of the LIR, the Project site for the Approved Prglect was an <br />agnculturai,fieId cotnpused or pt ,ne'Paitnland. Because the Approved Project wnulti convert <br />prime farmislnd to a residential and chiircli developnaertt, the C crtified EIR coact i led that impact% <br />to farmland would he significant and unaboiidable. <br />The Project site is currently undeveloped, is not used for a0culturalproduction; and isnot <br />designated Priine Farmland, Unique Farmland, or Familarid'of Statewide'Importance on maps <br />prepared pursuant to the Farmland Mapping and Monitoring Program of the California Resources <br />Agency.l The Revised Project would not convert Prime'Farmland, Unique Farmland, Farmland of <br />statewide lniportance, or"any"other type offarmland to a tion=ap icultural use. Futthrir,po <br />agricultural rise is adjacenEAo Elie Project sitg and the vicinity is developed with urbanuses. <br />"herefore, no iinpaetS.to Primo Futmlmil, Unique'Fannlat d, or Farinland of Statewide <br />hnportance,would occur as a rmultof Project implementation and no mitigation is . <br />required:herefore, the Revise([ Project would not result i L n new significalit'inupacts beyond those <br />identified in the Certified' EIR.'No new mitigation measures are required. <br />b} As stated abq-�,e'at the time of ccrtificatio_n of theEIR; the Project site was an agricultural field <br />composed ofptimc farmland. Accor¢fng to the.Calif'ornia Depatinient.of Gonserbation's.state of <br />California Williamson Act Contraei hand map for OrangeCounty:, the Project site is not currently <br />protected by, or elie'bie for `G'illiamson Act contract. N,o impacts to'agricuftural use a <br />Williamson Act contract would occur as a result of inipleinentaiien of the Revised Projeci. <br />'17lerefore, the Revised Project would not result in new significant impacts beyond those. <br />identified in (4c Certified FiR. No new mitigation measures are required. <br />o) At the time of certification of the MR, the Project site for the Approved Prq)ect wm an <br />agricultural field eoiitposed of prime farmland, Because theeApproved Project 1v661d convert <br />California Department of CanscrVatinn. httpsalmap3.conscrvat7077.ca.govJiilrp/cittimzseiieSJ (nccc sed <br />September 3, 2917)• <br />r:''SH016a4'•AilJeoauao'Nt1Jen8mn.doc:. MA:'OS/17n <br />75B-63 <br />2-14 <br />