My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75B - PH - AMEND ZONING 2001 W MACARTHUR
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2017
>
10/03/2017
>
75B - PH - AMEND ZONING 2001 W MACARTHUR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2017 5:09:37 PM
Creation date
9/28/2017 4:44:55 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75B
Date
10/3/2017
Destruction Year
2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
nv V1Ro NYNNYAL IMPACT REPORT ADDENDUM ARMSTRONG RANCiI RYV14Rp PIIGJEOT <br />9RPTE8RER 2017 ,SANTA ANA, OALIPORNIA <br />pririe fivinhind to,a residential and church development, the Certified E•,IR concluded that impacts <br />to farmland would be significant and unayoidable. <br />'fhe Project site is notcurrently used for agricultural production, The Revised Project would.not <br />convert farmland to a non-agricuh'uril oscrLikewise, the Revised Project would not contribute to <br />emrironinental changes that could result in conversion of farmland to non-agricultural. use. <br />Therefore, no impacts to farmlands would occur as a result of Project implementation and no <br />mitigation is required. Therefore, the Revised Project would not result in new silmificant impacts <br />beyond those identified in the CertiGul EIR. No new mitigation measures are required. <br />Mitigation ;Measures: <br />No mitigation is required, <br />Findings Related to:Agricultural Resources: <br />No New Significant Effects Requiring Major Certified EIR Revisions. Based on the foregoing <br />analysis and information; there is no evidence'that Project modifications require a major change to the' <br />Certified EIR. The Project changes will not result in new significant environmental impacts related to <br />Agricultural Resourcus, and lhcre is no substantial increase in the severity of impacts described in <br />Certified EIR. <br />No Substanthd Change In Circumstances Requiring Major Certified F,iR Revisions.'fhere is no <br />information in the'record or otherwise available that indicates tharlbcre are substantial changes in <br />circutnst:mevs per.[aining.to AgriculturelRmurces that would require major changes to the Ccrti�ied <br />EIR, <br />No New information Showing Greater'Significant Effects than the Certified EIR. This <br />Addendum has analyzed all available relevant information to determine whether there is new <br />information that was not available at the time the EIR was adopted, which would indicate thata new <br />significant effect not reported in that document might occur. Rased an the information and analyses <br />above, there is:no,substantialnew information indicating that there would be a new significant impact - <br />related to Agricultural Resources requiring major revisions to the Certified EIR. <br />No New Information Showing Ability to Reduce Significant Effects in the Certified EIR. There <br />are no alternatives to the Project or additional mitigationrncasures that would substantially reduce <br />one or more significant impacts pertaining to Agricultural Resources identified in and considered by <br />the Certified EIR. <br />P:15H[)16U31.IJJenJliriAAddtndunl::ecx n0'bVS.+I L. <br />75B-64 <br />
The URL can be used to link to this page
Your browser does not support the video tag.